Similar Projects
David Avenue Street Rehabilitation - CIP 23-04 - City of Pacific Grove
Infrastructure
Conception
$400,000 CJ est. value
Pacific Grove, CA 93940

David Avenue Street Rehabilitation - CIP 23-04 - City of Pacific Grove
Infrastructure
Conception
$400,000 CJ est. value
Pacific Grove, CA 93940

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Superelevation Correction, Shoulder Widening and Rumble Strips
Infrastructure
Design
$2,286,000 est. value
Monterey, CA 93944

CSUMB Aquatic Center - New Equipment Storage Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$450,000 CJ est. value
Seaside, CA 93955

Poured in Place Surfacing - Playground Equipment
Infrastructure
Bidding
$200,000 CJ est. value
Salinas, CA 93901

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polymer Modified Emulsion Chip Seal Coat on Existing Roadbed
Infrastructure
Post-Bid
$670,000 est. value

Construct Retaining Wall, Widening Shoulder and Place HMA
Infrastructure
Results
$1,490,000 est. value
CA

Sacramento Street Road Diet and Rehabilitation Project
Infrastructure
Results
$715,000 est. value
Salinas, Vallejo, CA 94590

Rehab Pavement
Infrastructure
Design
$23,350,000 CJ est. value
Castroville, CA 95012

Citywide Road Surface Repair Project - Phase 4
Infrastructure
Bidding
$2,000,000 CJ est. value
Monterey, CA 93940

Cold Plane AC Pavement, Overlay with RHMA and Replace bridge Railing
New Construction, Infrastructure
Post-Bid
$3,890,000 est. value
CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Install Beautification, Transportation Art, and Safety Measure Enhancement Project in Caltrans R/W
Infrastructure
Design
$1,860,000 CJ est. value
Greenfield, CA 93927

Last Updated 08/02/2022 12:07 PM
Project Title

Cedar Sunset And Congress Intersection Improvements - CIP 23-03 - City of Pacific Grove

Physical Address View project details and contacts
City, State (County) Pacific Grove, CA 93950   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This multi-year project would allow for the design, permitting, environmental review, and construction of safety and multi-modal improvements at the Cedar, Sunset, and Congress 5-way intersection. This project was identified via the Highway 68 Corridor Study conducted in conjunction with the Transportation Agency of Monterey County (TAMC) in 2016. This project would include a public feedback process, engineering, environmental review, a cooperative agreement with Caltrans for the proposed improve Project is included in the City of Pacific Grove's FY 2022-2023 Budget CIP. As of August 2, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents