Similar Projects
Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations (including Martha's Vineyard)
Results
Less than $1,163,000 est. value

Scheduled and Emergency Catch Basin and Drainage System Cleaning at Various Locations in Areas A, B, C and D (Excluding Martha's Vineyard and Nantucket Island)
Results
Less than $1,050,000 est. value

Beachmont - Sales Creek Neighborhood Sewer and Drainage Improvements
Results
Less than $630,000 est. value
Revere, MA

Retaining Wall Removal and Replacement and Chain Link Fence Removal and Replacement
Results
Boston, Hyde Park, MA 02136

Pier 4 Culvert and Sinkhole Repairs
Post-Bid
Less than $700,000 est. value
Boston, MA

FY 19-21 Small Item Waterfront Repair
Term Contract
Results
Less than $200,000 est. value
East Boston, MA 02128

Coughlin Park Shoreline Stabilization
Post-Bid
$198,850 est. value
Winthrop, MA

Retaining Wall Removal and Replacement
Results
Hyde Park, MA 02136

Catchbasin/Manhole Rehab and Pipe
Post-Bid
Less than $4,300,000 est. value
Boston, MA

Drainage Installation Services
Post-Bid
Boston, MA

Mills Avenue - Erosion Repair
Results
$40,000 est. value
Revere, MA

Scheduled and Emergency Drainage and Erosion Repairs at Various Locations (Including Martha's Vineyard)
Results
Less than $710,000 est. value

Drainage System Improvements, City-Wide
Results
Less than $192,000 est. value
Boston, MA 02118

Long Wharf Seawall Stabilization
Post-Bid
Boston, MA 02110

Last Updated 08/29/2019 01:46 AM
Project Title

Black Falcon Cruise Terminal Phase II Seawall Structural Rehabilitation

Physical Address View project details and contacts
City, State (County) Boston, MA 02210   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,345,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Black Falcon Cruise Terminal Phase Ii Seawall Structural Rehab. Repairs to the underside of the concrete deck of Black Falcon Cruise Terminal. All work will take place within the confined space of the gallery system below the deck of black falcon cruise terminal, with the exception of deck painting.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents