Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 est. value
Tulsa, OK 74127

US-64 and US-169 - Interchange
Infrastructure
Design
$7,445,109 est. value
Bixby, OK 74008

Woodstock Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$759,512 CJ est. value
Broken Arrow, OK 74012

Westwind Lift Station Conversion
New Construction, Infrastructure
Bidding
$150,000 CJ est. value
Broken Arrow, OK 74012

Asphalt
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Concrete
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

Pancho Anaya Bakery
Addition, Demolition, Renovation, Infrastructure - 11,700 SF
Pending Verification
$2,394,737 CJ est. value
Tulsa, OK 74128

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Last Updated 08/08/2022 09:47 AM
Project Title

Construction of Concrete Ramp

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74105   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $247,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an ADA-compliant concrete ramp to provide access to a scenic landing on the east bank of the Arkansas River near the 1900 block of Riverside Drive in Tulsa. Bid bonds are not required for this project. PROJECT JOB DESCRIPTION: An ADA-compliant concrete ramp connecting to the existing River Parks recreational trail and joining to a scenic concrete landing near the Arkansas River shall be built as detailed in Exhibit A, Construction Plans. Adjacent to the Project site are two commercial operations, the Sandbar Riverside Cafe and the Yard Bar, which shall remain open and must remain accessible during construction. The existing recreational trail is a dual trail, accommodating pedestrians/runners on the side closest to the river and cyclists on the other. One side of the trail shall remain open for public use during construction activities and Contractor shall provide all barricades, fencing, and signage necessary to ensure public safety. River Parks staff shall be notified in advance by Contractor of any required short-term closure of the entire trail to identify an alternate route for trail users

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents