Similar Projects
SWS 758 Pump Station 7 and 9 Repairs
Renovation
Post-Bid
Wichita, KS

2021 Main Lift Station and Forcemain Improvements
New Construction
Post-Bid
$1,820,000 est. value
Eudora, KS

Pump Station 4 Force Main Realignment
Renovation
Results
$500,000 to $600,000 est. value
Kansas City, KS

Cedar Mill Pump Station Force Main Replacement
Renovation
Results
Olathe, KS

SWS 762 Phase 1 Pump Station 6-9 Repairs
Renovation
Post-Bid
$200,000 est. value
Wichita, KS

Lakeside and Simmons Sewer Pump Station Improvements
Renovation
Results
Augusta, KS

Sewer System Improvements
Renovation, Infrastructure
Post-Bid
$1,800,000 est. value
Independence, KS

Lift Station No. 2 Improvements
New Construction
Results
Emporia, KS

Eagle Bend Golf Course Irrigation System Improvements
Renovation
Post-Bid
$5,000,000 est. value
Lawrence, KS 66044

199th and Webster Pump Station and Force Main
Renovation
Results
Spring Hill, KS

RFQ Armourdale Industrial District Pump Station Improvements Construction Manager At-Risk Services
Renovation
Results
Kansas City, KS 66118

Sewer Lift Station Improvements
Renovation
Results
$225,000 est. value
McPherson, KS

Booster Pump Station #8 & Transmission Waterline Improvements - Contract B
Renovation, Infrastructure
Results
$1,285,000 est. value
Garden City, KS

West Prairie Trace Lift Station
New Construction
Results
$562,693 est. value
Gardner, KS

2022 Lift Station Replacement
New Construction
Results
Olathe, KS 66061

Last Updated 06/08/2022 03:53 AM
Project Title

SWS #762 Phase 2 Pump Station 12-13 Repairs

Physical Address View project details and contacts
City, State (County) Wichita, KS   (Sedgwick County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and renovation of a water / sewer project in Wichita, Kansas. Completed plans call for the renovation of a water / sewer project. All work on the project shall be completed by December 31, 2022. The non-availability of material shall not prevent working days from being assessed.Bidders Are Advised to Contact the Office of the City Engineer (316-268- 4501) Should They Have Any Questions or Concerns About the Plans, Special or Supplemental Provisions, Minority Status, or the Proper Preparation of the Bid Document.ork order on this project shall be issued at the Contractors request. Conflicts with utilities shall not have an effect on the completion date. Bid Bond in the Amount of Five Percent (5%) Of the Total Bid or an Annual Bid Bond Is Required Prior to Bid Opening.The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Kevin Yale, Flood Control Supervisor, at (316) 268-4095, kyale@wichita.gov

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents