Similar Projects
Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Design Activities are Limited to: Architectural Retaining Wall
Results
$7,500,000 to $9,999,999 est. value
PA

SR 3048, Noblestown Road Slide Remediation
Results
$1,000,000 to $2,499,999 est. value
PA

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Fairywood Industrial Development
New Construction, Infrastructure - 150,000 SF
Pending Verification
$7,000,000 CJ est. value
Pittsburgh, PA 15219

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

Plum Street Improvements Phase 6
Infrastructure
Post-Bid
Elizabeth, PA 15037

W Ohio St/Ridge Ave Br's
Results
$2,500,000 to $4,999,999 est. value
PA

The Park (Southside Works Riverfront Apartments)
New Construction, Infrastructure - 350,000 SF
Construction
$85,000,000 CJ est. value
Pittsburgh, PA 15203

Oakland Crossing Mixed-Use Development / Pittsburgh
New Construction, Infrastructure
Pending Verification
$370,000,000 CJ est. value
Pittsburgh, PA 15219

Last Updated 06/09/2023 02:06 PM
Project Title

Construction of Davis Avenue Pedestrian Bridge (CD)

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This bridge will replace the previously demolished bridge, spanning from Davis Avenue to Riverview Park over Woods Run Avenue in the Brighton Heights neighbourhood in the City of Pittsburgh. The City of Pittsburgh's Office of Management and Budget, on behalf of the Department of Mobility and Infrastructure, is soliciting bids for the construction of a Prefabricated Steel Pedestrian Bridge per the approved contract plans. This bridge will replace the previously demolished bridge, spanning from Davis Avenue to Riverview Park over Woods Run Avenue in the Brighton Heights neighborhood in the City of Pittsburgh. The new bridge is to be a 3-span pedestrian/bicycle bridge into Riverview Park. The bridge has a total proposed length of about 396 ft and a vertical clearance of about 73 ft above Woods Run Ave. It will be supported by new intermediate piers supported by spread footings while reusing the existing masonry abutments. The new bridge is to be a 3-span pedestrian/bicycle bridge into Riverview Park. A Bid Bond is required. Guarantees should be in the form of a surety bond, certified check, cashier's check or letter of credit in an exact dollar amount equal to five percent (5%) of the bid. For example, a total bid of $100,000.00 should have a bid guarantee in the amount of $5,000.00. Upload a copy of your bid bond under the respective Vendor Questionnaire section. Mail hard copy bid bonds to: Office of Management & Budget, Bureau of Procurement 414 Grant Street Room 502 Pittsburgh, PA 15219-2419 Performance Bond A performance bond in an exact dollar amount equal to the full amount (100%) of their contract will be required from each awarded vendor for any resulting contract. Payment Bond Invitation for Bid #2023-IFB-095 Title: Construction of Davis Avenue Pedestrian Bridge All work to be completed and material furnished under this contract shall be in accordance with the contract documents including The Pennsylvania Department of Transportation (PennDOT) Question Submission Deadline: May 30, 2023, 3:00pm. All questions shall be submitted via Email. All questions shall be submitted via "Q&A" feature on OpenGov The expected Project Completion Date will be twelve (12) months from Notice to Proceed Guarantees should be in the form of a surety bond, certified check, cashier's check or letter of credit in an exact dollar amount equal to five percent (5%) of the bid. For example, a total bid of $100,000.00 should have a bid guarantee in the amount of $5,000.00. A performance bond in an exact dollar amount equal to the full amount (100%) of their contract will be required from each awarded vendor for any resulting contract. A payment bond in an exact dollar amount equal to the full amount (100%) of their contract will be required from each awarded vendor for any resulting contract. The City reserves the right to reject, for any reason, any or all bids if it is in the best interest(s) of the City to do so MBE (18%), WBE (7%), DVBE (5%)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents