Similar Projects
Last Updated | 09/08/2021 08:42 AM |
Project Title | Final Engineering Design Services for the Little Econ Trail Phase 3 (S.R. Pedestrian Bridge) (from Baldwin Park Street to Richard Crotty Parkway) |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32813 (Orange County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide final engineering design and construction plan preparation for the above reference project. The Consultant shall perform those engineering services required to prepare a complete set of contract documents (plans and specifications) as described elsewhere herein. The project consists of a new pedestrian bridge crossing S.R. 436 from approximately 390’ west of SR 436 edge of pavement (EOP) on Baldwin Park Street to approximately 660’ east of SR 436 EOP on Auver Boulevard/Future Richard Crotty Parkway. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |