Similar Projects
Twinwood Parkway Phase 1B, Segment A and Segment A Bridges
New Construction
Bidding
TX

US0083 - Replace Bearing Seat Pads
New Construction
Bidding
$221,712 est. value
TX

Bridge Building and Reconstruction
Term Contract
Post-Bid
TX

Bridge Creek Recreation Center Facility
Post-Bid
TX

Saginaw Bailey Boswell Overpass
Results
$11,500,000 est. value
TX

Bridge Repair Various Locations
Results
Less than $218,508 est. value
TX

Removal of Bridge and Construction of a Low Water Crossing
New Construction, Infrastructure
Bidding
Robert Lee, TX 76945

Brock Park Golf Course Bridge Replacement
Post-Bid
$875,000 est. value
Houston, TX 77078

Brazos Bridge Over Smith Street and Holman Street (Deck Slab Replacement)
Results
$2,479,000 est. value
Houston, TX 77000

Bridge and Road Construction at Greenhouse Road 4 from North of Toledo Bend Trails Lane to South of Tuckerton Road for Harris County Precinct 3
New Construction, Infrastructure
Bidding
Houston, TX 77282

Sh 130 2019 Bridge Rehabilitations (Bridges 36, 73 & 74)
Post-Bid
Buda, TX 78610

Park Road 22 Bridge Bond 2004 (Re-Bid)
Results
Less than $12,580,000 est. value
Corpus Christi, TX 78469

Bridge Construction at Gosling Road Over Spring Creek for Harris County Precinct 4
New Construction, Infrastructure
Bidding
Houston, TX

Bridge Project
Post-Bid
Bellville, TX 77418

Replacement of Bridges and Channel Modifications Along Brays Bayou
Results
Houston, TX 77002

Last Updated 06/05/2021 03:01 AM
Project Title

US 67 - Replace Bridge and Approaches

Physical Address View project details and contacts
City, State (County) TX   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,442,223
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 13.000 1 104 6001 Removing Conc (Pav) Sy 1,215.000 2 104 6009 Removing Conc (Riprap) Sy 3,986.000 3 104 6027 Removing Conc (Appr Slab) Sy 125.000 4 105 6082 Removing Stab Base & Asph Pv(10 to 16") Sy 707.000 5 110 6001 Excavation (Roadway) Cy 104.000 6 112 6001 Subgrade Widening (Ord Comp) Sta 5.000 7 132 6005 Embankment (Final)(Ord Comp)(Ty C) Cy 1,584.000 8 160 6001 Furnishing and Placing Topsoil (4") Sta 7.000 9 164 6054 Bond Fbr Mtrx Seed (Perm)(Rural)(Sand) Sy 6,581.000 10 164 6055 Bonded Fbr Mtrx Seed (Temp)(Warm) Sy 3,291.000 11 164 6056 Bonded Fbr Mtrx Seed (Temp)(Cool) Sy 3,291.000 12 168 6001 Vegetative Watering Mg 106.000 13 169 6002 Soil Retention Blankets (Cl 1) (Ty B) Sy 1,822.000 14 275 6001 Cement Ton 36.000 15 275 6010 Cement Treat (Subgrade) (8") Sy 2,579.000 16 310 6009 Prime Coat (Mc-30) Gal 646.000 17 314 6010 Emuls Asph (Erosn Cont)(Ss-1) Gal 110.000 18 316 6017 Asph (Ac-20-5tr) Gal 8,295.000 19 316 6126 Aggr(Ty-pb Gr-4 Sac-a) Cy 231.000 20 400 6005 Cem Stabil Bkfl Cy 194.000 21 409 6004 Prestr Conc Pil (24 in Sq) Lf 7,952.000 22 420 6014 Cl C Conc (Abut)(Hpc) Cy 30.200 23 420 6030 Cl C Conc (Cap)(Hpc) Cy 233.600 24 422 6008 Reinf Conc Slab (Slab Beam)(Hpc) Sf 37,418.000 25 422 6016 Approach Slab (Hpc) Cy 84.000 26 425 6011 Prestr Conc Slab Beam (4sb15) Lf 3,206.000 27 425 6012 Prestr Conc Slab Beam (5sb15) Lf 4,809.000 28 432 6006 Riprap (Conc)(Cl B) Cy 8.900 29 432 6008 Riprap (Conc)(Cl B)(Rr8&rr9) Cy 841.000 30 432 6045 Riprap (Mow Strip)(4 in) Cy 48.000 31 450 6024 Rail (Ty Sstr)(Hpc) Lf 1,644.000 32 454 6003 Armor Joint Lf 88.000 33 454 6004 Armor Joint (Sealed) Lf 421.000 34 496 6011 Remov Str (Bridge 500 - 999 Ft Length) Ea 1.000 35 500 6001 Mobilization Ls 1.000 36 502 6001 Barricades, Signs and Traffic Handling Mo 24.000 37 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 80.000 38 506 6011 Rock Filter Dams (Remove) Lf 80.000 39 506 6020 Construction Exits (Install) (Ty 1) Sy 200.000 40 506 6024 Construction Exits (Remove) Sy 200.000 41 506 6038 Temp Sedmt Cont Fence (Install) Lf 1,635.000 42 506 6039 Temp Sedmt Cont Fence (Remove) Lf 1,635.000 43 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 160.000 44 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 160.000 45 510 6003 One-way Traf Cont (Port Traf Sig) Mo 23.000 46 512 6067 Ptb (Frn&instl)(F Shape)(Ty 1) or (Stl) Lf 1,361.000 47 512 6069 Ptb (Move)(F Shape)(Ty 1) or (Stl) Lf 1,967.000 48 512 6071 Ptb (Remove)(F Shape)(Ty 1) or (Stl) Lf 1,361.000 49 540 6001 Mtl W-beam Gd Fen (Tim Post) Lf 1,000.000 50 540 6006 Mtl Beam Gd Fen Trans (Thrie-beam) Ea 4.000 51 542 6001 Remove Metal Beam Guard Fence Lf 1,204.000 52 545 6003 Crash Cush Atten (Move & Reset) Ea 4.000 53 545 6005 Crash Cush Atten (Remove) Ea 2.000 54 545 6019 Crash Cush Atten (Instl)(S)(N)(Tl3) Ea 2.000 55 644 6061 in Sm Rd Sn Sup&am Tytwt(1)ws(T) Ea 2.000 56 658 6014 Instl Del Assm (D-sw)sz (Brf)ctb (Bi) Ea 16.000 57 658 6016 Instl Del Assm (D-sw)sz (Brf)gf1 (Bi) Ea 12.000 58 662 6050 Wk Zn Pav Mrk Remov (Refl) Ty Ii-a-a Ea 537.000 59 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld) Lf 6,320.000 60 662 6075 Wk Zn Pav Mrk Remov (W)24"(Sld) Lf 44.000 61 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld) Lf 23,755.000 62 662 6111 Wk Zn Pav Mrk Sht Term (Tab)ty Y-2 Ea 600.000 63 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 111.000 64 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 4,555.000 65 3077 6032 Sp Mixes Sp-c Pg76-22 Ton 79.000 66 3077 6064 Sp Mixes Sp-d Pg76-22 Ton 1,261.000 67 3077 6075 Tack Coat Gal 1,789.000 68 6001 6002 Portable Changeable Message Sign Ea 2.000 69 6149 6001 Refl Pav Mrk Awt (W) 4" (Sld) (100mil) Lf 2,600.000 70 6149 6007 Refl Pav Mrk Awt (Y) 4" (Sld) (100mil) Lf 6,115.000 71 6149 6008 Refl Pav Mrk Awt (Y) 4" (Brk) (100mil) Lf 1,285.000 72 6185 6002 Tma (Stationary) Day 283.000 73 6185 6003 Tma (Mobile Operation) Hr 20.000 74

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents