Similar Projects
WUD 9 - Roof Drain Replacement and Repairs
Term Contract
Bidding
Boca Raton, FL 33428

Belle Glade Senior Center
Post-Bid
Belle Glade, FL 33430

Annual Contract - Roofing
Term Contract
Post-Bid
West Palm Beach, FL 33411

Lake Worth Community High School - Roof Replacement
Results
Less than $2,112,000 est. value
Lake Worth, FL 33460

Roofing Rehabilitation/Replacement Services
Term Contract
Results
West Palm Beach, FL 33412

Roofing Envelope Services
Post-Bid

Roof Systems Maintenance, Repair, Installation and Evaluation
Term Contract
Results

Robinson Village Re-Roofing
Post-Bid
$175,000 to $190,000 est. value
West Palm Beach, FL 33407

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roof Coating of Florida Highway Patrol(Fhp)Troop K Building #4715 Lake Worth, Florida`S Turnpike Mainline(Sr 91), Milepost 94.0
Post-Bid
Greenacres, FL 33467

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

WUD Digester Building 1 and 2 - Roof Replacement
Post-Bid
Boynton Beach, FL 33437

PBCHA Dyson Circle Apartments Hurricane IRMA Roofing Repairs
Results
West Palm Beach, FL 33407

Mayme Frederick Service Center - Roof Replacement
Term Contract
Post-Bid
West Palm Beach, FL 33404

VFW Roof Replacement
Results
Less than $38,000 est. value
Palm Springs, FL 33461

Last Updated 03/23/2021 11:43 PM
Project Title

Fire Station No. 2 Re-Roof

Physical Address View project details and contacts
City, State (County) Lake Worth, FL 33461   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete roof removal to both concrete and metal deck systems. New ¼” Tapered Insulation on all concrete decks, per slopes shown. 1.0” minimum thickness. .5” Securock cover boards, all set in UIA (universal insulation adhesive) in ribbons spaced @ 8” o.c. on concrete deck. The metal deck insulation shall be attached per JohnsManville requirements using screw & plates. Then set the Securock cover board in UIA over tapered ISO insulation ISO, ½” Securock, all mechanically attached, to meet FBC 2020.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents