Similar Projects
City of West University Place Pavement Leveling
Post-Bid
West University Place, TX 77005

Replace 400W Metal Halide Parking Lot Lights
Post-Bid
Houston, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Neighborhood Street ReconstructionNo. 460 (Subproject 2), Ashland Street
Results
Less than $1,670,993 est. value
Houston, TX 77251

Imperial Forest Section 5
Post-Bid
Houston, TX

2020 Paving Improvements Project
Results
$344,000 est. value
Piney Point Village, TX 77063

Paver Project - University Park Building 11
Post-Bid
Houston, TX

Shepherd Drive and Farnham Street Civil and Utility Duct Improvements (US 59 to Westheimer Road)
Results
Less than $23,462,071 est. value
Houston, TX 77098

Gessner Road Crosswalk Pavers Replacement
Infrastructure
Post-Bid
$530,000 est. value
Houston, TX 77282

Rollingbrook Reconstruction
Results
Less than $2,256,677 est. value
Baytown, TX 77520

Water, Sanitary, Drainage and Paving Facilities in Marvida Section 20
Infrastructure
Post-Bid
$945,000 est. value
TX

Reported 07/13/2022 11:20 AM
Project Title

Pedestrian Safety Improvement Ella And Beltway 8 - T-112600 - City Of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Exterior Lighting, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Electrical, lighting improvements, and column painting. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of July 12, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents