Similar Projects
Last Updated | 03/22/2021 10:51 AM |
Project Title | 155th Street and Pilot Knob Roadway Improvements and Orchard Place Pilot Knob Turn Lane Improvements |
Physical Address | View project details and contacts |
City, State (County) | Apple Valley, MN 55124 (Dakota County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,144,211 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2,100 LF Remove Curb and Gutter 11,700 SF Remove Concrete Walk, Driveway, and Valley Gutter 1,500 SY Remove Bituminous Street, Driveway, and Trail Pavement 2 EA Sanitary Sewer Structure 410 LF PVC Sanitary Sewer 270 LF Steel Casing Pipe 2,100 LF DIP Water Main 36 EA Storm Sewer Structure 2,100 LF RCP Storm Sewer 25,000 CY Common Excavation 8,600 TN Select Granular Borrow 9,600 TN Cl 5 Aggregate Base 5,200 TN Bituminous Mixture 5,500 LF Concrete Curb and Gutter 29,500 SF Concrete Walk, Driveway, Median, and Valley Gutter 1 LS Traffic Signal System 300 SF Traffic Signs 12,000 LF Pavement Markings 28,500 SY Turf Restoration 40 EA 1.5” and 2.5” Diameter Tree 1 LS Irrigation System |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |