Similar Projects
Sakura Asian Village
New Construction - 90,000 SF
Conception
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Fowler Building
Renovation - 51,675 SF
Conception
Detroit, MI 48226

Consumers Energy New Office Building
New Construction - 40,000 SF
Design
$20,000,000 est. value
Grand Rapids, MI 49504

Acrisure - New Headquarters
New Construction - 105,000 SF
Design
Grand Rapids, MI 49503

Office Improvements
Renovation
Bidding
Marquette, MI 49855

Marquette Alger Regional Education Service Agency Office Improvements
Bidding
Marquette, MI

Office Renovation at 12251 James Street
Renovation
Post-Bid
Holland, MI

Bseed Phase 2 Office Renovation
Renovation
Post-Bid
Detroit, MI 48226

Marie Tribe of Chippewa Indians, Health Center – Office and Bathroom Upgrades
Results
Sault Sainte Marie, MI

Office Renovation Suite 828
Renovation, Term Contract
Results
Detroit, MI

Park District Project
New Construction - 87,152 SF
Construction
$154,000,000 est. value
East Lansing, MI 48823

Live Well Homes
Renovation, Addition - 21,000 SF
Construction
$900,000 est. value
Royal Oak, MI 48067

Telegraph Road Office
New Construction - 10,308 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Bloomfield, MI

Women's City Club Redevelopment
Renovation - 57,000 SF
Pending Verification
$25,000,000 est. value
Detroit, MI 48201

Marquette Building
Renovation - 10,000 SF
Conception
Detroit, MI 48226

Last Updated 12/11/2020 12:53 PM
Project Title

Alter Base Defense Operations Center, Battle Creek, MI

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49037   (Calhoun County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: Contractor shall alter the space of the BDOC by expanding into adjacent office space. Contractor will alter walls, doors, ceilings, and install new flooring as indicated. Install a unisex bathroom and break area counter with sink. Alter the wet pipe sprinkler system to new floor plan. Alter plumbing system by installing water, waste, and vent lines for new unisex bathroom and sink. Alter mechanical systems by: removing existing duct work and installing new ducts to provide supply and return air to new space, alter supply piping, install new heat pump, exhaust fan, air cooled condensing unit, and electric wall heater. Electrical system will be altered to include power and lighting. Alter technology systems to include: Communications outlets and wiring, Advantor security system. A Statement of Work (SOW), Drawings and Specs will be provided in a solicitation package at a later date. This document is intended to find interested contractors who may/would participate in the competition for this project.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents