Similar Projects
East Headworks - Heating Ventilating and Air Conditioning HVAC
Bidding
Pittsburgh, PA

Silverliner V HVAC Units
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

H--Boiler and Chiller Water Treatment Services Pittsburgh VAMC
Post-Bid
Pittsburgh, PA 15420

A251-0935, HVAC Installation Lunch Room and Garage Office
Results
Less than $99,999 est. value
PA

20 Ton A/C Unit - Coil and Condensing Unit
Results
Less than $31,600 est. value
New Castle, PA 16102

Lower Allen Commons Retail Center - Mechanical (HVAC/Plumbing
Bidding
Camp Hill, Lower Allen, PA 17011

City Hall HVAC System Preventative Maintenance Services
Post-Bid
Philadelphia, PA 19107

Elevator Space Conditioning (HVAC)
Results
Less than $170,000 est. value
Pittsburgh, PA 15212

NAVFAC Building 2B HVAC Replacement
Bidding
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19111

HVAC Replacement Project
Renovation
Post-Bid
Sciota, PA 18354

Provide a Comprehensive Heating-Ventilation-Air Conditioning HVAC Maintenance and Repair Program for the Beaver County Courthouse
Results
Beaver, PA 15009

Water Treatment Plant Clarifier Building - HVAC Construction
Bidding
$45,000 est. value
Jefferson, Rices Landing, PA 15357

Acquity Uplc H-Class System Air Management Services
Post-Bid
Philadelphia, PA

HVAC Renovations - HVAC Construction
Results
Wexford, PA 15090

Last Updated 11/17/2020 10:58 AM
Project Title

Cedar Hall HVAC Upgrades - Phase 2

Physical Address View project details and contacts
City, State (County) State College, University Park, PA 16802   (Centre County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Contract Award
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of 210 Fan Coil Units (FCUs furnished by PSU) and associated re-wiring to Onity Controllers Addition of three make-up air systems consisting of Exhaust fan Energy Recovery Units and four pipe Air Handling Units (ERVs and AHUs furnished by PSU); Addition of six louvered cupolas and attic equipment platforms and associated general construction Addition of condensing boilers; modification to the existing dual temp water system to add glycol and VFDs and a dedicated pump for the AHU cooling coils Exhaust system modifications Replacement of four existing split DX units. Package No 1: HVAC Construction

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents