Misc. Buildings, Site Development Construction Project Lead, Springfield, IL 62703 (Sangamon County)
Last Updated | 03/10/2023 12:11 PM |
Project Title | Demolish and Construct Rest Areas and Vending Buildings |
Physical Address | View project details and contacts |
City, State (County) | Springfield, IL 62703 (Sangamon County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 , Request For Proposals, Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $7,800,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 2023, construction documents are complete and under state review. Contractor bidding is expected to commence in June 2023. *The original solicitation is listed below for reference. --- Appropriated Amount: $800,000 Professional Liability Insurance Required: $1,750,000 Project Fee Classification: Group II R The Railsplitter Northbound Rest Area (D0687) is a 1,188 square foot, one-story building constructed in 1964. The Railsplitter Southbound Rest Area (D0688) is a 1,188 square foot, one-story building constructed in 1964. The Railsplitter Northbound Rest Area Vending Building (D0796) is a 447 square foot, one-story building constructed in 1998. The Railsplitter Southbound Rest Area Vending Building (D0795) is a 447 square foot, one-story building constructed in 1998 The scope of work provides for demolishing two existing main rest area buildings (D0687 and D0688) and two vending buildings (D0795 and D0796), including an analysis and design for connection to the city sewer system at the northbound location. The work provides for constructing two new public rest area facilities, two approximately 400 square foot garage storage buildings, new picnic areas, including shelters and two outdoor exercise/play areas. This work may include, but is not limited to architectural, geotechnical, civil, structural, electrical, mechanical, landscape design, and electrical services as needed. The work also provides for a new electrical service, if needed This project will be completed in two phases, beginning with the northbound location. Demolition and reconstruction of the northbound facility shall be complete prior to the start of phase two southbound work. New buildings shall be sited to preserve existing mature trees where possible and allow for maximum utilization of remaining property for parking areas. Parking areas and access sidewalks will be designed by IDOT and coordinated with building design and location. Building design and exterior landscaping shall reflect the significance of location and proximity to the State Capitol. All demolished materials, including sewage lagoons shall be removed from the site. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 15 percent is applicable to the A/E team. A VBE goal of 3 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for September 25, 2019. The method of contractor selection has not been determined at this time |
||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 800 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |