Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Design
$54,700,000 est. value
San Jose, CA 95135

Berkeley Commons Offices and Laboratories
New Construction - 728,088 SF
Design
$10,000,000 CJ est. value
Berkeley, CA 94710

East Brokaw Road Development
New Construction - 39,100 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
San Jose, CA 95154

Monte Vista Terrace Demolition and New Office
New Construction, Demolition
Bidding
Fresno, CA 93701

Y--Correct Critical Safety Hazards and Rehabilitate the Ahwahnee Hotel NHL-Seismic
Renovation
Post-Bid
$10,000,000 est. value
Yosemite National Park, CA

Fedex #1020
Renovation - 8,332 SF
Post-Bid
Los Angeles, Torrance, CA 90505

Job Order Contracting a License
Renovation
Results
Merced, CA

As Needed Maintenance and Repair Services
Renovation
Results
Calexico, El Centro, CA 92231

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

UCSD Theater District Living & Learning Neighborhood
New Construction - 900,000 SF
Construction
San Diego, CA 92037

Pratt & Whitney Research Facility
Renovation - 33,263 SF
Pending Verification
$1,500,000 est. value
Carlsbad, CA 92008

Harrison Gardens Mixed Use Development
New Construction - 876,940 SF
Pending Verification
$518,000,000 est. value
San Francisco, CA

La Bahia Hotel
New Construction
Conception
Santa Cruz, CA 95060

Last Updated 01/24/2022 09:12 AM
Project Title

Holiday Inn Express and Suites

Physical Address View project details and contacts
City, State (County) Rohnert Park, CA 94928   (Sonoma County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel, Office
Contracting Method Design-Build Firm to Subcontract.
Project Status Schematic Drawings, Seeking Site Plan Approvals, Construction Start Expected second quarter 2023, Construction Completion Expected fourth quarter 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project entails construction of a 55,600-square-foot, 4-story hotel building that would include 93 rooms. A 2,500-square-foot, 2-story, mixed-use commercial building would be built at the southwest corner of the site. A total of 100 vehicle parking spaces would be provided.

Details

,, 58,100 SF - Office, 2,500 SF New Construction, Building, Hotel/Motel, 55,600 SF New Construction, 93 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents