Similar Projects
Elevated Water Storage Tank Construction
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Rushmore, MN 56168

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

2021 Clary Street and Mcmillan Street Concrete Restoration
Post-Bid
$560,000 est. value
Worthington, MN 56187

Cecilee Street Extension
Results
Worthington, MN 56187

2021 Street Paving Improvements
Infrastructure
Results
$1,144,000 est. value
Adrian, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Bituminous Overlays
Infrastructure
Results
$324,680 est. value
Worthington, MN

Ryan's Road SAP Bituminous Mill and Overlay
Infrastructure
Post-Bid
Less than $433,000 est. value
Worthington, MN

27th Street Extension
Infrastructure
Results
Worthington, MN

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Post-Bid
$35,000 to $40,000 est. value

Bridge Beam Straightening - By County
Renovation, Term Contract, Infrastructure
Results

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Bridge Replacement with Box Culvert
Renovation, Infrastructure
Results
MN

Eighth Avenue Street and Utility Improvements
Infrastructure
Post-Bid
$620,000 est. value
Worthington, MN 56187

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Last Updated 08/10/2022 01:35 PM
Project Title

Bridge (BR) 89247 Replacement - CSAH 18 Over Okabena Creek

Physical Address View project details and contacts
City, State (County) Lorain Township, MN 56119   (Nobles County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Bridge (BR) 89247 Replacement - CSAH 18 Over Okabena Creek Expected Award Date:09/20/2022 Project Start Date:05/29/2023 Construction Start Date:05/29/2023 Construction End Date:10/23/2023 Work Type:Bridge Project Type:Bridges Highest Funding Level:Federal DBE Project:Yes

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents