Similar Projects
The Innovation Campus
New Construction - 130,000 SF
Conception
$10,000,000 CJ est. value
Fort Collins, CO 80521

Hughes Stadium Redevelopment
New Construction
Conception
Fort Collins, CO 80526

Stoney Point Meadows
New Construction - 177,000 SF
Design
$30,000,000 est. value
Fort Collins, CO

Oak 140
New Construction - 95,443 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Fort Collins, CO 80524

2021 Estes Valley Workforce Housing
Bidding
Estes Park, CO 80517

Brookstone Apartments Rehabilitation
Results
Loveland, CO 80537

Kinston Residential Phase 1 Overlot Grading
Results
Loveland, CO 80537

Brick Stone on Harmony
New Construction - 202,000 SF
Construction
$10,000,000 CJ est. value
Fort Collins, CO

Riverbend Timnath
New Construction - 39,061 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Timnath, CO 80547

South Taft Hill Road Mixed Use Development
New Construction - 19,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Collins, CO

Cleveland Avenue Retail and Offices
Renovation
Pending Verification
Loveland, CO

Ridgewood Hills
New Construction
Conception
Fort Collins, CO 80525

Watermark at Spring Creek
New Construction - 3,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Fort Collins, CO

Berthoud Campus Expansion Project Phase I
Results
Less than $19,000,000 est. value
Berthoud, CO 80513

Oasis On Olive
New Construction - 8,468 SF
Construction
$3,600,000 est. value
Fort Collins, CO 80521

Last Updated 04/24/2020 01:11 PM
Project Title

Waterglen Pud Multi-Family

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80524   (Larimer County)
Category(s) Commercial, Education, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Pre-School/Daycare, Site Development
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Office, 1 Story Above Grade, 3,750 SF New Construction, 1 Pre-School/Daycare, 1 Story Above Grade, 6,200 SF New Construction, Apartments/Condominiums, New Construction, 30 Unit(s), Site Development, 2.73 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents