Last Updated 01/16/2019 02:29 AM
Project Title

Milling, Resrufacing and Shoulder Reconstruction

Physical Address View project details and contacts
City, State (County) NC   (Buncombe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1 Section Each Of Us - 25, Nc - 112, Us - 19/Us - 23bus, Nc - 191, Nc - 9, Nc - 151, And Nc - 197, And 106 Sections Of Secondary Rds Roadway Items Lump Sum Ls Mobilization 25,350 Lb Sealing Existing Pavement Cracks 1,552 Ton Incidental Stone Base 60.74 Smi Shoulder Reconstruction 7,899 Ton Aggregate Shoulder Borrow 101,670 Sy Milling Asphalt Pavement, ***" Depth (1-1/2") 8,750 Sy Milling Asphalt Pavement, ***" Depth (5/8") 55,408 Sy Milling Asphalt Pavement, ***" To ******" (0" To 1-1/2") 17,963 Sy Incidental Milling 31,440 Ton Asphalt Conc Surface Course, Type s9.5b 31,896 Ton Asphalt Conc Surface Course, Type s9.5c 4,023 Ton Asphalt Binder For Plant Mix 18 Ton Polymer Modified Asphalt Binder For Plant Mix 25,906 Ton Patching Existing Pavement 177,016 Sy Asphalt Surface Treatment, Double Seal 177,016 Sy Asphalt Surface Treatment, Fog Seal 97,415 Gal Emulsion For Asphalt Surface Treatment 9 Wk Vacuum Truck 341 Ton Ultra-Thin Bonded Wearing Course 24,869 Sy Generic Paving Item Latex Modified Micro-Surfacing Typeiii 192 Ea Adjustment Of Manholes 158 Ea Adjustment Of Meter Boxes Or Valve Boxes 8,268 Sf Work Zone Advance/General Warning Signing Lump Sum Ls Temporary Traffic Control 785 Lf Thermoplastic Pavement Marking Lines (8", 90 Mils) 2,648 Lf Thermoplastic Pavement Marking Lines (8", 120 Mils) 240 Lf Thermoplastic Pavement Marking Lines (12", 90 Mils) 164 Lf Thermoplastic Pavement Marking Lines (16", 120 Mils) 6,052 Lf Thermoplastic Pavement Marking Lines (24", 120 Mils) 152 Ea Thermoplastic Pavement Marking Character (120 Mils) 397 Ea Thermoplastic Pavement Marking Symbol (90 Mils) 5 Ea Cold Applied Plastic Pavement Marking Symbol, Type ** (Ii) 964,841 Lf Paint Pavement Marking Lines (4") 526,422 Lf Polyurea Pavement Marking Lines (4", 20 Mils) 2,778 Lf Polyurea Pavement Marking Lines (8", 20 Mils) 22,990 Lf Removal Of Pavement Marking Lines (4") 80 Lf Removal Of Pavement Marking Lines (24") 9 Ea Removal Of Pavement Marking Symbols & Characters 2,739 Ea Snowplowable Pavement Markers Lump Sum Ls Portable Lighting 30,180 Lf Inductive Loop Sawcut
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents