Similar Projects
Woods Creek Reach 11 Restoration
Infrastructure
Bidding
$1,500,000 est. value
Lake in the Hills, IL 60156

Prairie Trail South, Crystal Creek Bridge Streambank Stabilization
Infrastructure
Post-Bid
Algonquin, IL

Ground Water Treatment Plant
New Construction
Post-Bid

Crystal Lake Water Systems Improvements WTP 2
New Construction
Results
Less than $322,313 est. value
Crystal Lake, IL 60014

Woods Creek Pump Station Improvements
Results
Algonquin, IL

Lift Stations #23 & #24 Replacement Pump Purchase
Renovation
Post-Bid
Crystal Lake, IL

Wedgewood Pond Shoreline Stabilization
Results
Lake in the Hills, IL

Culvert Purchase
Infrastructure
Post-Bid
Crystal Lake, IL

Culvert Repairs
Infrastructure
Results
McHenry, IL 60051

Demolition, Clean Up, Restoration, and Legal Removal of Debris
Infrastructure, Alteration
Post-Bid
Woodstock, IL

Cherry Valley Road Culvert Improvements
Infrastructure
Results
Bull Valley, IL 60050

2022 Annual Sidewalk, Curb, and Pedestrian Ramp (ADA) Replacement Program
Infrastructure
Post-Bid
Crystal Lake, IL

Lift Station No. 16 Improvements
Renovation
Results
Crystal Lake, IL 60014

Iron Filter Rehabilitation
Renovation
Results
Fox River Grove, IL 60021

Hennings Subdivision Completion of Infrastructure Contract C Stormwater Management
Infrastructure
Results
Huntley, IL

Last Updated 03/29/2022 01:08 PM
Project Title

Hennings Subdivision Completion of Infrastructure Contract A Manholes, Lift Station, and Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Huntley, IL   (McHenry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation, Water Treatment Plant, Renovation.
Division 01 - General Requirements.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 22 - Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents