Similar Projects
Water Supply Well Rehabilitation
Infrastructure
Bidding
Coral Springs, FL

Deep Injection Wells No. 3 and No. 4 Pump Station
Infrastructure
Post-Bid
$83,400,000 est. value
Hollywood, FL 33019

Well Rehabilitation
Term Contract, Infrastructure
Post-Bid
$180,000 est. value
Lauderdale Lakes, FL 33319

Mechanical Integrity Testing of the Wastewater Treatment Plant Injection Wells
Results
Less than $120,000 est. value
Pembroke Pines, FL 33027

SBDD Rebuilding of Stormwater Pumps
Results
Southwest Ranches, FL 33331

Pumping Services (Scheduled/Unscheduled)
Infrastructure
Post-Bid
$400,000 est. value
Fort Lauderdale, FL

Fiveash Water Treatment Plant Backwash Pump Conversion
Results
Less than $5,000 est. value
Fort Lauderdale, FL

SRWWTP Injection Wells 1 and 2 Mechanical
Infrastructure
Post-Bid
Hollywood, FL 33019

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
FL

Regional Wastewater Treatment Plant Injection Well Mechanical Integrity Testing
Results
Plantation, FL

GTL Deepwell Electric Power Instrumentation and Control
Results
Fort Lauderdale, FL

Flygt Pumps Replacement/Repair Services
Results
Miramar, FL

By-Pass Pumps Maintenance
Results
Davie, FL

Backwash Pump Replacement at 2A Water Treatment Plant
Results
Pompano Beach, FL 33064

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
$164,450 est. value
FL

Reported 04/21/2022 12:00 AM
Project Title

High Service Pump Replacement at 1A Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Lauderdale Lakes, FL 33319   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $11,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope includes, but is not limited to, the furnishing of all labor, materials, equipment, services and incidentals to provide High Service Pump Replacement at 1A WTP for Water and Wastewater Services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents