Similar Projects
HVAC Replacement at Carver Library
Renovation
Sub-Bidding
$400,000 CJ est. value
Winston Salem, NC 27105

Lewisville Elementary School HVAC Unit Replacement
Post-Bid
Lewisville, NC 27023

Lewisville HVAC Replacement
Post-Bid
Lewisville, NC 27023

Chiller/Cooling Tower Replacement
Alteration
Results
Less than $300,000 est. value
Winston-Salem, NC 27101

Middle Fork Elementary ERV Replacement
Renovation
Results
$1,255,000 CJ est. value
Walkertown, NC 27051

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

East Forsyth High School HVAC Unit Replacement
Alteration
Post-Bid
Kernersville, NC 27284

Diggs-Latham Elementary ERV Replacement
Renovation - 77,283 SF
Results
$296,700 CJ est. value
Winston Salem, NC 27101

Lewisville Elementary School HVAC Replacement
Alteration
Post-Bid
Lewisville, NC 27023

Gibson Elementary School ERV Replacement
Renovation
Results
$1,121,600 CJ est. value
Winston Salem, NC 27106

Meadowlark Middle School Gym HVAC Renovations
Alteration
Post-Bid
Winston-Salem, NC 27106

Kernersville Middle School Gym HVAC Renovations
Alteration
Post-Bid
Kernersville, NC 27284

Mineral Springs Middle School Gym HVAC Renovations
Alteration
Post-Bid
Winston-Salem, NC 27105

Clemmons Middle School Gym HVAC Renovations
Alteration
Post-Bid
Winston-Salem, NC 27127

Bolton HVAC Project
Alteration
Post-Bid
$150,000 est. value
Winston-Salem, NC 27103

Last Updated 08/18/2022 03:05 PM
Project Title

WSSU Boiler 1 Replacement

Physical Address View project details and contacts
City, State (County) Winston Salem, NC 27110   (Forsyth County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the WSSU Boiler 1 Replacement Project includes replacing boiler 1 in the existing steam plant at WSSU. Refer to documents for full scope. Bids will be received for Single Prime Contracts. All proposals shall be lump sum. The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143- 128.2c Effective 1/1/2002.) All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for unlimited Building. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities. The Contractor shall commence work to be performed under this Contract on a date to be specified in written order from the Designer/Owner and shall fully complete all work hereunder within (90) consecutive calendar days from the Notice to Proceed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents