Similar Projects
Fy21 Mobile District`S Dredging Requirements
Design
Mobile, AL

Mechanical Dredge - Mobile Harbor, Mobile, AL
Post-Bid
Less than $24,000,000 est. value
Dauphin Island, AL 36602

Mobile Harbor, Alabama, Deepening and Widening - Phase 3
Post-Bid
$25,000,000 to $100,000,000 est. value

D'Olive Bay Boat Channel Dredging Project
Results
$700,000 to $800,000 est. value
Daphne, AL

Market Research and Sources Sought Notice - dredging for the Mobile District U.S. Army Corps of Engineers' Mobile Harbor Deepening project in Mobile, AL.
Results
$10,000,000 to $25,000,000 est. value
Mobile, AL

Mcnally Park Maintenance Dredging
Infrastructure
Post-Bid
Mobile, AL 36605

Cosby Lake Dredging Project
Results
Birmingham, AL 35126

IDIQ Contract for Rental of 24 Inch Cutterhead Pipeline Dredge for Dredging
Results
$10,000,000 to $25,000,000 est. value

Spring 2020 Maintenance Dredging
Results
Mobile, AL

Dredge Mooring Areas USCG Sector Mobile, AL
Results
$500,000 to $1,000,000 est. value
Mobile, AL

Dredge Material Pumping and Barge Hauling
Results
Mobile, AL

Constructing the Maintenance Dredging of Little Lagoon Pass in Gulf Shores as Indicated in the Plans
Results
$838,297 to $1,024,585 est. value
Gulf Shores, AL

Water Treatment Plant Residuals Dredging, Dewatering, and Disposal
Results
Ragland, AL

IDIQ SATOC for Rental of Hopper Dredge for Dredging Mobile District Navigation Projects in AL, FL, and MS
Term Contract
Results
$1,000,000 to $5,000,000 est. value

Fall 2021 Maintenance Dredging
Infrastructure
Results
$2,700,000 est. value
Mobile, AL

Reported 09/16/2021 06:18 PM
Project Title

Dredge Disposal Site Preparation

Physical Address View project details and contacts
City, State (County) Florence, AL   (Lauderdale County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $449,744
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the removal and disposal of approximately 67,200 cubic yards of existing fill material in the Port Authority`s dredge disposal site. These materials were placed on the site in approximately 1993 when the Port was last dredged.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents