Similar Projects
Curlin Cafe - Refurbishment
Renovation
Conception
Saratoga Springs, NY 12866

Easy Goer
Renovation
Conception
Saratoga Springs, NY 12866

Commercial Kitchen Spaces
Renovation - 4,000 SF
Design
$500,000 est. value
Buffalo, NY 14202

Panera #6080
New Construction - 4,450 SF
Design
$1,900,000 est. value
Suffern, NY 10901

36 Depot Street
Alteration
Bidding
Tupper Lake, NY 12986

10 Cliff Avenue
Alteration
Bidding
Tupper Lake, NY 12986

The Mansion House at the Beeches
Renovation - 23,000 SF
Sub-Bidding
Rome, NY 13440

Chuck E Cheese #516
Renovation - 17,876 SF
Sub-Bidding
Buffalo, NY 14219

Wyldwyck Resort & Spa
New Construction, Build-Out - 54,677 SF
Post-Bid
Saugerties, NY 12477

Vassar Inn & Institute
New Construction - 48,142 SF
Post-Bid
$34,000,000 est. value
Poughkeepsie, NY 12603

City of Plattsburgh - Dock Street Development - Developer Services
Results
Plattsburgh, NY 12901

Tully CSD Capital Project 2022 - Phase 2
New Construction, Renovation
Results
Tully, NY 13159

Holiday Inn Express
New Construction
Construction
New Rochelle, NY 10801

Rexford Landing Mixed Use
New Construction - 20,000 SF
Construction
$2,000,000 to $3,000,000 est. value
Clifton Park, NY 12065

Concern for Independent Living Supported Housing
New Construction - 6,188 SF
Pending Verification
Southampton, NY 11968

Last Updated 05/03/2022 10:48 AM
Project Title

Biotechnology Building Third Floor Laboratory Renovation

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14853   (Tompkins County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method
Project Status Construction Commenced January 2022, Construction Completion Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,393,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to renovate approximately 3,800 square feet of existing office and laboratory space for the Weill Institute for Cell and Molecular Biology (WICMB) on the 3rd floor of the Biotechnology Building. The scope includes all construction required to accomplish the work, including but not limited to the following: a. Maintain proper egress and life safety systems at all times. Maintain all existing building element fire ratings. b. Demolition and renovation of existing layout, mechanical, electrical, plumbing, and fire protection (MEPFP) as required. c. The installation of new fume hoods d. Replacement of old casework in lab suites 353/353B, and 357/357B e. MEP modifications and construction to support new lab equipment. f. Update finishes throughout the offices and lab spaces and additional furnishings as required.

Details

1 Food/Beverage Service, 3 Stories Above Grade, 3,800 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents