Similar Projects
Water Meter Replacement
Infrastructure
Design
$83,850 CJ est. value
Porterdale, GA 30014

Expand Terminal Apron Vidalia Regional Airport
Infrastructure
Bidding
$800,000 CJ est. value
Vidalia, GA 30474

Stormwater Improvements - Hunter Road, Forest Lane and Morgan Road
Infrastructure
Bidding
$200,000 CJ est. value
Union City, GA 30291

Commerce WTP Raw Water Pumping Improvements
Renovation
Sub-Bidding
$200,000 CJ est. value
Commerce, GA 30529

Plumbing Services for DeKalb Cares
Term Contract
Sub-Bidding
Decatur, GA 30030

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Post-Bid
$1,890,079 CJ est. value
Atlanta, GA 30334

Plumbing Service and Repair for Fire Department
Alteration
Post-Bid
Augusta, GA

Purchase Bottle Filler Station and ADA Cooler
Alteration
Results
Marietta, GA

Hot Water Renovation Project for Heritage High School
Alteration
Results
$412,000 est. value
Conyers, GA 30094

Cowan's Lake Raw Water Pump Station Improvements
Renovation
Pending Verification
$86,000 CJ est. value
Villa Rica, GA 30180

KSU - Plumbing Maintenance, Repair, and Installation Services
Alteration
Post-Bid
Kennesaw, GA

Plumbing Services
Alteration
Results
Decatur, GA 30030

Plumbing Services 2021
Alteration
Post-Bid
Warner Robins, GA

PVC Schedule 40 DWV Pipe
Term Contract
Results
GA

Georgia Weatherization Assistance Program
Alteration
Post-Bid
Jasper, GA

Last Updated 03/28/2023 08:34 AM
Project Title

2023 Stormwater Pipe Lining

Physical Address View project details and contacts
City, State (County) Peachtree City, GA 30269   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,082,818 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For CIPP Pipe Lining The City of Peachtree City will be receiving separate sealed Bids for all material, labor and equipment for the "2023 Stormwater Pipe Rehabilitation Project - CIPP Lining Method". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: This project consists of the trenchless rehabilitation (CIPP Lining Method) of 9,244 LF of 15" to 36" diameter corrugated metal stormwater drainage pipe including 138 LF of 22" x 36" elliptical CMP. The selected pipes are located throughout the City. The City desires a fully structural liner at each project location and it will be the Contractors responsibility to determine liner thickness. The City has provided a table indicating the depth of pipe and is included as Attachment C. Groundwater is not known to be an issue at each project location. This contract is locally funded. It is mandatory that all prospective bidders download the Project Manual from the website above. Each Bidder is responsible for checking the website above for any future Addendums and emailing the Purchasing Agent with any questions. Each Bidder must deposit with his bid, security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 "Instruction to Bidders." Each Bidder is required to submit a "Construction Contractors Qualification Statement", "Bid Security", "Bid Form", Non-Collusion Affidavit", and "Security and Immigration Compliance Affidavit" as outlined in Section 00 22 13 "Supplementary Instructions to Bidders." The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. The project shall be Substantially Complete within 120 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Final Completion. There will not be a "Pre-Bid" meeting on N/A located at the City of Peachtree City office. If there is a pre-bid meeting, all contractors submitting a Bid are required to attend. The City of Peachtree City provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained byN/A. The City of Peachtree City will not accept pre-bid project questions within a period of 120 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. The City of Peachtree City will not issue or cause to be issued any addenda modifying the Project Manual within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. Agreement will require a Payment Bond in the amount of 110%, and a Performance Bond in the amount of 100% of the project cost. The City of Peachtree City reserves the right to bid a project in phases and award the contract on the phases it deems to be in the City's best interest.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents