Similar Projects
US-259 - Intersection Modification and Traffic Signals
Infrastructure
Post-Bid
OK

Intersection Modification and Traffic Signals US-259
Infrastructure
Results
OK

Traffic Signals
Infrastructure
Results
OK

Traffic Signals
Infrastructure
Results

Independence and Garriott Signalization Improvements
Infrastructure
Results
Enid, OK

Four Corners Signal Improvements
Infrastructure
Results
Muskogee, OK

Intersection Modification and Traffic Signals
Infrastructure
Results
OK

Cheyenne Middle School Traffic Signal Project
Infrastructure
Results
Edmond, OK 73003

Traffic Signals, School Zone Flashers, Signing and Striping
Infrastructure
Results
OK

Traffic Signal and Lighting Installation and Repairs, Citywide
Infrastructure
Results
$10,000,000 est. value
Oklahoma City, OK

Traffic Signals
Infrastructure
Results

Intersection Modification and Traffic Signals
Infrastructure
Results
OK

South Broken Arrow TIF Norfolk Drive Signal Poles and Mast Arms Procurement
Infrastructure
Results
$115,000 est. value
Broken Arrow, OK

Traffic Signal Cabinets
Infrastructure
Results
Broken Arrow, OK

Traffic Signals City Streets (S. Memorial Drive/S. Mingo Road)
Infrastructure
Results
Bixby, OK

Last Updated 05/10/2022 04:13 AM
Project Title

West Albany Street and North Stone Ridge Drive Traffic Signal Repair

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes repairs to the traffic signal system at the interchange of West Albany Street and North Stone Ridge Drive. The repairs include replacement of two (2) signal poles, partial replacement of an emergency preemption system, replacement of three (3) vehicle signal heads and two (2) pedestrian signal heads, and replacement of signal span wire. Contract time for the project is Forty-five (45) calendar days.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents