Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Alternate Aviation Ground Power Unit (AGPU) Generator
Post-Bid
Atlanta, GA

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Three Phase Pad Mounted Transformers
Results
Covington, GA 30014

Purchase of Electrical Materials Six-Mo Contract
Term Contract
Post-Bid
Lawrenceville, GA 30046

Electrical Repair and Services
Results
Augusta, GA 30900

Fire Station No.4 Solar Energy System
Post-Bid
Less than $99,000 est. value
Athens, GA 30606

New Kitchen HVAC and Lighting Replace WHS, MRE and WES
Results
Less than $515,824 est. value
Cartersville, White, GA 30120

Installation Project for Gen-Set at City Hall
Post-Bid
Bainbridge, GA 39817

Scott Candler Water Treatment Plant - Ozone Generators Design and Installation
Results
Doraville, GA 30360

Automatic Backup Generator
Post-Bid
Scotland, GA 31083

Paulson Stadium LED Conversion
Results
Statesboro, GA 30460

Electric Motor Repair and Replacement Service
Post-Bid
GA

Plant Transformer
Results
Augusta, GA 30900

Cathodic Protection Ground Beds and One Cathodic Protection Rectifier
Post-Bid
Bainbridge, GA 39818

Reported 10/28/2021 12:00 AM
Project Title

Central Steam Plant Boiler Controls Replacement and Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Athens, GA   (Clarke County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $4,900,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the second of several phases in a planned, comprehensive renewal of the Central Steam Plant. The scope of this project will replace the controls system in its entirety and relocate the Control Room operation currently located in BH#2 to a newly constructed 2-story space in BH #1. The facility’s main electrical service entrance will be replaced along with normal and emergency power distribution systems. Subsequent phases that are not included in this contract will replace all three existing gas-fired boilers and balance of plant equipment to increase total plant capacity and meet future demands. Future phases will occur over a span of several years as funds become available.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents