Reflectorized Pavement Markings
Infrastructure
Sub-Bidding
$30,000 CJ est. value
New Bedford, MA 02740

Exterior Painting at the Brickenwood and Westlawn Public Housing Developments
Post-Bid
$80,000 est. value
New Bedford, MA

Interior Painting
Post-Bid
$160,000 est. value
Dartmouth, MA 02747

Soffit and Fascia Repair and Painting at the Studley Elementary School
Alteration
Results
$40,000 est. value
Attleboro, MA 02703

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Interior Painting of Vacant State Funded Units
Alteration
Post-Bid
$35,000 est. value
Fall River, MA

Decking Repairs and Replacement of Fire Decks - Filed Sub-Bids
Alteration
Results
$261,034 est. value
Somerset, MA 02726

Interior Painting of Vacant Federally Funded Units
Alteration
Post-Bid
$150,000 est. value
Fall River, MA

Easton Town Hall Exterior Preservation - Filed Sub Bid
Alteration
Results
$1,000,000 est. value
Easton, MA 02356

Exterior Painting
Alteration
Post-Bid
New Bedford, MA

Building E VCT Installation
Alteration
Results
$75,000 est. value
Fall River, MA

High Street Water Storage Tank - External Painting
Alteration
Post-Bid
$265,000 est. value
North Attleborough, MA

Harold H. Galligan School Window, Exterior Door and Boiler Replacement Project - Sub-Bids
Alteration
Results
$1,350,000 est. value
Taunton, MA 02780

Adamsdale Well Pump Station with a New Building
Alteration
Post-Bid
$3,700,000 est. value
North Attleborough, MA

Walsh Well PFAS Treatment, Plant Upgrades - Sub Bids
Alteration
Results
$6,000,000 est. value
Mansfield, MA 02048

Last Updated 09/15/2022 03:32 AM
Project Title

Painting the Exterior Of the Village School House Building

Physical Address View project details and contacts
City, State (County) Freetown, MA 02702   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Painting the Exterior of the Village School House located at 5 North Main Street Assonet, MA. Labor to include Removing all peeling paint and repairing any necessary wood areas. Lead Paint is present. Contractor must be certified in Lead Paint abatement and removal Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Project Description: Scope of Work involves the following: 1.) Remove all peeling, scaling, and failing paint layers and caulking by scraping and sanding. No chemical treatment shall be used without Town authorization. 2.) Hand sand (no power sanding) to smooth out all rough edges to create a smooth transition for application of new primer and paint. 3.) Soft wash all exterior wood and metal surfaces prior to applying primer/sealer. 4.) Prime and paint all exterior surfaces to include, but not limited to, siding, fascia, shadow and trim boards, eaves, door frames and trim, window frames and trim, railings, steps, ramps, gutter, downspouts, shutters. 5.) Primer shall be one (1) coat and a minimum of two (2) top coats. 6.) Stainless steel nails and screws shall be used for refastening loose or installing replacement wood siding and other wood/metal items. 7.) Identify wood surfaces that need to be replaced. Contractor shall photograph all deteriorated wood for the Town to review and approve prior to replacement. Material type and additional cost to be approved by Town prior to replacement. 8.) Contractor shall use ladders, scaffolding or lift devises in a manner that will not damage the roof.\ or fascia. 9.) Lead paint is present, and Contractor shall be certified for lead paint abatement and removal and shall follow all federal and state requirements. 10.) Final clean-up of site. 11. ) Paint to be primarily white, however some trim is to be painted green. Completion Date: As soon as practicable, projected to be completed by December 15, 2022, if feasible. Prevailing Wage Required: YES Contractor shall provide a minimum of(2) year warranty on the work covering parts, materials, and workmanship. This shall be provided in writing to the Town. All warranty work repair work is to be provided at no charge to the Town.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents