Last Updated | 07/18/2023 01:55 PM |
Project Title | Phase 1 Esser Shade Structures - Group 2 Various Sites |
Physical Address | View project details and contacts |
City, State (County) | Lakewood, CA 90712 (Los Angeles County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $695,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide construction services for the installation of (8) total DSA Approved 30'x40' Fabric Shade Structure Projects located at Bancroft, Cleveland, Holmes, Hoover, Keller, Marshall, Newcomb and Riley, per the bid documents and specifications. The scope of work will include but no limited to the installation of (4) steel posts into asphalt, concrete or grass areas, installation of the fabric shade, possible path of travel and ADA accessibility upgrades requested by DSA. Each site is site specific and may require additional demo, added concrete pads, drinking fountains, etc. Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements B License. All contractors and subcontractors must maintain the valid/active license throughout the duration of the project. Bid Valid 90days Liquidated Damages $1,000/day Estimated Bid Value $800,000 Start/Delivery Date 10/24/22-7/1/23 Project Duration 250 consecutive calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% ESTIMATED PROJECT COST: $800,000 Locations- Bancroft Middle School - 5301 E Centralia St Long Beach, CA 90808 Cleveland Elementary School - 4760 Hackett Ave Lakewood, CA 90713 Holmes Elementary School - 5020 Barlin Ave Lakewood, CA 90712 Hoover Middle School - 3501 Country Club Dr Lakewood, CA 90712 Keller Dual Immersion Middle School - 7020 E Brittain St Long Beach, CA 90808 Riley Elementary School - 3319 Sandwood St Lakewood, CA 90712 Newcomb Academy - 3351 Val Verde Ave, Long Beach, CA 90808 Selective demolition and construction necessary for the Esser Shade Structures, Phase 1, Group 2, at Cleveland Elementary School, Holmes Elementary School, Riley elementary School, Bancroft Middle School, Hoover Middle School, Keller Middle School, Marshall Middle School, and Newcomb Academy, including associated civil, architectural, structural, plumbing, and/or electrical work as indicated in the Drawings and Specifications. Generally, these categories of work involve new finishes, adaptive reuse and modification of certain selected areas, handicap accessibility retrofits, changing and expanding selected infrastructure utilities |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |