Similar Projects
Arts & Cultural Facility Renovation
Renovation, Alteration
Design
Weston, WV

Beasley Student Center Re-Roofing
Alteration
Bidding
$200,000 est. value
Athens, WV 24712

Robert C. Byrd Clinic Roof Replacement
Alteration
Bidding
$400,000 est. value
Lewisburg, WV 24901

Roofing Repair and Maintenance
Post-Bid

Roofing Repair and Maintenance
Post-Bid

Chelyan Salt Building Roof Exit 85
Results
Charleston, WV 25306

MET Theatre Roof Repair
Results
Less than $277,165 est. value
Morgantown, WV 26505

Building B Roof Replacement Project
Alteration
Bidding
$230,000 est. value
White Sulphur Springs, WV 24986

Claymont Mansion Roofing Repairs
Post-Bid
Charles Town, WV 25414

Hawks Nest State Park CCC Restrooms and Gift Shop Roof Rehabilitation
Results
Ansted, WV 25812

Huntington Tri-State Armory - Roof Replacement
Alteration
Bidding
$200,000 est. value
Kenova, WV 25530

West Virginia School of Osteopathic Medicine Main Building Roof Replacement
Post-Bid
Lewisburg, WV 24901

Roof Replacement - Western Regional Juvenile Center
Results
Barboursville, WV

Replacement of the Roof on the Water Plant
Alteration
Bidding
$686,000 est. value
Pine Grove, WV

Historic Building Roof Removal & Replacement
Renovation
Post-Bid
Harpers Ferry, WV 25425

Reported 05/21/2022 12:00 AM
Project Title

SUT FY22 DAM Roof Replacement

Physical Address View project details and contacts
City, State (County) Sutton, WV   (Braxton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all equipment and labor to necessary to properly remove/dispose of current Ethylene Propylene Diene Monomer (EPDM) roof and underlayment. Contractor shall prepare concrete roof surface for replacement and install new EPDM roofing system with proper grade and drainage to existing center drain on roof, approximately 1,400 square feet. Asbestos removal was conducted during previous roof installation. Access to roof is via ladder and hatch in center of roof. U.S. Army Corps will supply crane for lifting/lowering supplies to top of roof from dam roadway surface. Photos of roof provided in Exhibit A. 2. Scope of Work and Information: A. Contractor shall remove current EPDM rubber material as well as underlayment materials to the bare concrete. Contractor shall dispose of materials properly and prepare site for installation. B. Contractor shall install EPDM rubber roofing that meets ASTMD4637/D463M-10 Standard Specifications for single ply roof membrane. All materials shall be of high quality and free from defect at time of install and come with a 20 year manufacturers warranty. C. Contractor shall install 90 mil EPDM type roof membrane according to manufacturer's recommendations. i. Concrete/drain shall be inspected and repaired if necessary prior to installation. ii. Concrete must be completely dry at time of installation. iii. Care shall be taken to ensure HVAC components on roof are not damaged during installation and are properly functioning when finished. D. Contractor shall install new tapered, rigid insulation underlayment with a minimum of 1/2 inch thickness to provide proper base for new roof and correct drainage, following all manufacturer's specifications. i. Base insulation shall be secured to concrete surface by hot asphalt mopping method or similar compatible, manufacturer's recommended method with roofing system. ii. Contractor shall ensure underlayment system is compatible with EPDM membrane and adhesive method used. iii. Contractor shall secure roof membrane to underlayment insulation system with proper adhesive or add additional substrate layer to ensure roof material will be secured properly with nothing touching the roof membrane that will cause leaks. iv. Contractor shall install roof membrane that is properly attached with minimal wrinkles and proper drainage with no areas where water will stand or pool. v. Contractor shall ensure roof membrane is one solid piece and no seams are used. E. Contractor shall install termination bars on parapet walls, chimney and roof hatch.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents