Similar Projects
Flamingo-Boulder Hwy North, Charleston-Maryland to Boulder Hwy and Maryland Pkwy System (Charleston-Maryland Storm Drain)
Results
$51,800,000 to $62,600,000 est. value
Las Vegas, NV 89121

Hollywood System Centennial To Speedway #2 Detention Basin
Post-Bid
$9,000,000 to $9,500,000 est. value
North Las Vegas, NV 89031

Luning Drive Storm Drain Improvements
Results
$2,136,577 to $2,585,259 est. value
Las Vegas, NV

Black Mountain Detention Basin Repairs
Results
$1,345,000 est. value
Henderson, NV 89015

Valve and Actuator Conversion
Post-Bid
Las Vegas, NV 89121

Kings Row Fire Flow Upgrades
Results
$153,900 to $188,100 est. value
Reno, NV

Stead Sewer Capacity Project - Phase I
Results
Reno, NV

Muller Parkway Improvement Project
Post-Bid
$9,400,000 est. value
NV

Water Main Replacement Project for G Street and Shriver Boulevard
Results
$338,962 to $414,286 est. value
Reno, NV

Maryland Campus Vault Repairs
Results
$150,000 est. value
Las Vegas, NV

Brunswick Transmission Main Repair
Post-Bid
Carson City, NV

Newport Lane Water Main Replacement
Results
$278,757 to $340,703 est. value
Reno, NV

Sparks Marina Lake Level Control Pipeline Project
Infrastructure
Post-Bid
Sparks, NV

Caughlin 5 Pressure Zone Looping
Infrastructure
Bidding
$608,850 to $744,150 est. value
Reno, NV

South Virginia 24" Main (Kumle To Peckham)
Alteration
Bidding
$1,024,650 to $1,252,350 est. value
Reno, NV

Reported 05/26/2021 09:20 AM
Project Title

Long Street Reconstruction Project

Physical Address View project details and contacts
City, State (County) Carson City, NV   (Carson City County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $2,150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to, installation of 8” PVC water main, 8” sewer main, 18” RCP storm drainpipe as well as reconstruction of Long Street between Roop Street and Saliman Road in Carson City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents