Similar Projects
Carson City Fleet Services Tire and Welding Shop
New Construction, Infrastructure
Post-Bid
$1,195,261 CJ est. value
Carson City, NV 89701

Roadbed Modification, Coldmill, and Place Plantmix Bituminous Surface With Open Grade
Infrastructure
Results
$17,600,000 CJ est. value
Fallon, NV 89406

Karen Avenue Storm Drain Improvements - Maryland Parkway to Flamingo Wash
Infrastructure
Results
$16,379,760 CJ est. value
Las Vegas, NV 89121

Demolish Residential Properties at University Center Drive
Demolition, Infrastructure
Results
$1,157,788 CJ est. value
Paradise, NV 89119

CMAR Tonopah Residence Hall Life Safety Project
Renovation
Post-Bid
$200,000 CJ est. value
Las Vegas, NV 89154

Neonopolis Garage Foundation Wall Repair
Renovation
Results
$647,660 CJ est. value
Las Vegas, NV 89101

Laboratory Front End Remodel
Build-out
Results
$240,090 CJ est. value
Las Vegas, NV 89102

Pahrump Chip Seal Screenings
Term Contract
Post-Bid
Pahrump, NV 89048

Plumas Street Gym Restroom ADA Upgrades
Infrastructure
Results
$496,520 CJ est. value
Reno, NV 89509

SR445, Washoe County
Infrastructure
Bidding
$49,000,000 CJ est. value
Sparks, NV 89436

Dispatch Relocation Tenant Improvements
Demolition, New Construction, Infrastructure
Bidding
$211,200 CJ est. value
Reno, NV 89512

Last Updated 01/20/2023 12:52 PM
Project Title

Median Widening to Add Southbound Truck Climbing Lanes

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89106   (Clark County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $10,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Type: District-1 Contract Cost Range: R28 ($7,950,000.01 to $9,550,000) Prequalification Required: Y County(s): CLARK Route(s): IR015-2 Contract Days: 120 (working) Enterprise Goal: 9.9% Liquidated Damages: $5,800.00 Project Length: 8.0000 mi Project Length: 8.0000 mi Stations: XW 1993+78.44 P.O.T. - XW 299+10.26 P.O.T. Location: I-15, North of the US 93 Garnet Interchange median widening to add Southbound truck climbing lanes NVDOT - Median Widening to Add Southbound Truck Climbing Lanes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents