Last Updated | 03/15/2021 04:40 AM |
Project Title | Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42 |
Physical Address | View project details and contacts |
City, State (County) | Akron, OH 44301 (Summit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1: SUM-8/76/77-0.63/9.74/8.42 The pavement will be replaced on I-77 from Waterloo Road to Lovers Lane and between Princeton Street on I-76/77 and Vernon Odom Boulevard/SR 261 on I-77. Also in these locations, minor maintenance of various bridges is planned as well as major repairs to three bridges: I-76/77 over Manchester Road, I-76/77over Bowery Street/Ohio Canal and I-76/77 over Lakeshore Boulevard. To help traffic flow, the project includes adding a lane on I-77 northbound and southbound between the Central Interchange and Waterloo Road and on SR 8 southbound between Carroll Street and the Central Interchange. The Carroll Street exit ramp on SR 8 northbound will be widened from one lane to two lanes to improve traffic flow during and after construction. Part 2: SUM-8/76/77-0.00/10.99/11.54 The ramps near the Central Interchange, from I-76 west to I-77 south, I-76 west to SR 8 north and I-76/I-77 east to SR 8 north will be reconfigured using improved geometry to allow higher speeds resulting in less traffic congestion and increased safety. The existing ramps are short with sharp curves and contribute to traffic congestion and crashes. To accommodate the reconfigured ramps, the Lafollette Street bridge over I- 77 is to be replaced with a new pedestrian/bicycle bridge over I-77. Coventry Street will be removed between Kipling Street and Lafollette Street and converted to a multipurpose trail. The bridges over Brown Street and Inman Street will be widened and other bridges will be maintained. The I-76 west exit ramp to Inman Street/Johnston Street and the I-77 south Lovers Lane exit ramp are to be closed to improve traffic flow and to construct the proposed improvements. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |