Similar Projects
Diesel Generator Maintenance
Term Contract
Sub-Bidding
Ames, IA 50010

Fiber-To-The-Premise Distribution and Drop Network
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Waverly, IA 50677

Uninterruptible Power Supplies (UPS) Maintenance
Term Contract
Post-Bid
Shenandoah, IA - Bellevue, Grand Island, Holdrege, Lincoln, Norfolk, North Platte, NE 68105

Boone AASF Generator Addition
Alteration
Post-Bid
$385,000 est. value
Boone, IA 50036

City Hall Led Lighting Upgrade
Alteration
Results
Less than $375,000 est. value
Sioux City, IA

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

2023 Electrical System Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Anthon, IA 51004

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Transmission Modifications
Infrastructure
Results
$590,000 est. value
Ames, IA 50010

City Hall Lighting Control Upgrades
Renovation
Sub-Bidding
$500,000 CJ est. value
West Des Moines, IA 50265

Grimes Office Building Lighting Replacement
Alteration
Post-Bid
Des Moines, IA 50319

Davenport AASF Generator Addition
Alteration
Results
Davenport, IA 52806

Cherokee Community School District Middle School Lighting Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Cherokee, IA 51012

Emergency Generator Systems Inspection and Maintenance
Alteration
Post-Bid
Des Moines, IA

Surgical Lights and Video Integration System
Term Contract
Results
Less than $8,000,000 est. value
Des Moines, Iowa City, IA - Saint Cloud, MN - Fargo, ND - Fort Meade, SD

Last Updated 02/02/2023 03:59 PM
Project Title

Well No. 2 Standby Generator Installation

Physical Address View project details and contacts
City, State (County) Peosta, IA 52068   (Dubuque County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $145,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct improvements including all labor, materials, and equipment necessary for excavation, backfill, and site work; reinforced concrete generator mounting pad; standby generator unit with automatic transfer switch and associated appurtenances; controls integration; electrical conduit/wire and miscellaneous associated work, including cleanup, site restoration and seeding. All proposals and bids in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for receiving bids. All proposals shall be made on official bidding blanks furnished by the City, and any alterations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to 5% of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of the bid. The bid security should be made payable to THE CITY OF PEOSTA, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form included in the specifications. Bidders will be required to comply with the President's Executive Order No. 11246. The requirements for bidders and contractors under this order are explained in the Federal grant documents. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes; provided that the award of contract will be made to the lowest responsible bidder submitting the lowest responsive bid, which shall be determined without regard to state or local law whereby preference is given on factors other than the amount of the bid. The City reserves the right to reject any and all bids, to waive informalities and technicalities and to enter into such contract as it shall deem for the best interest of the City. The City reserves the right to defer acceptance of any proposal for a period not to exceed fortyfive (45) calendar days from the date of hearing. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of two (2) years after its completion and acceptance by the City Council. All Contractor(s) and subcontractor(s) are required to obtain tax exemption certificates from the City of Peosta, Iowa for this project. These tax exemption certificates are only for use on this specific project as covered under the Contract. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed and shall be completed by July 1, 2024, subject to any extensions of time which may be granted by the City. The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site. Proof of purchase amount and verification of insurance for stored materials must be provided with any request for payment of stored materials. The Owner shall have the right to enter the premises for the purpose of doing work not covered by the contract documents. This provision shall not be construed as relieving the Contractor of the sole responsibility for the care and protection of the work, or the restoration of any damaged work except such as may be caused by agents or employees of the Owner.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents