Similar Projects
Burdette Park Lift Station Rehabilitation Project
Renovation
Bidding
$547,800 est. value
Evansville, IN

New Main Lift Station and Unsewered Areas Project
New Construction
Bidding
Rensselaer, IN

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

Lawrenceburg Conservancy District Pump Station Discharge Inspections
New Construction
Bidding
Greendale, IN

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

U1095 Parkside Terrace Lift Station Rehabilitation
Renovation
Bidding
$455,600 est. value
Evansville, IN 47708

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Last Updated 09/27/2021 10:05 AM
Project Title

Gary Sanitary District 27th and Chase Pump Station Force Main Replacement - Section 219, Gary, Lake County, Indiana (USACE Acquisition)

Physical Address View project details and contacts
City, State (County) Gary, IN   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The contractor w ill replace approximately 700 linear feet of new 45” force main. The new force main w ill tie into the existing force main at the 27th and Chase Street Pump Station and be jack and bored under the I80/I294 Expressw ay and then installed by open cut excavation and reconnecting to the existing force main. This w ill allow future improvements to be performed on the rest of the existing force main.

Details

Lift and Pump Stations, Build-Out.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents