Similar Projects
Santa Fe Right of Way - PRWPK21012 - City of Berkeley
New Construction
Conception
$4,050,000 est. value
Berkeley, CA 94704

Marina Capital - City of Berkeley
Renovation
Conception
$700,000 est. value
Berkeley, CA 94704

Central Avenue Safety Improvements - C65600 - City of Alameda
Infrastructure
Design
$12,200,000 est. value
Alameda, CA 94501

Prepare Site and Utilities for An EHRM Command Center Phase 2 / Livermore
Infrastructure
Bidding
$5,000,000 est. value
Livermore, CA 94550

Stadium Track and Field Improvement
Renovation
Bidding
$3,249,000 est. value
Hayward, CA 94542

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Mission Boulevard Linear Park
Renovation
Results
$2,046,000 est. value
Hayward, CA

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

SCS Dublin Mixed-Use Development
New Construction - 265,000 SF
Pending Verification
$10,000,000 est. value
Dublin, CA 94568

7TH/Anthony Traffic Signal Project - PWTRCT1605 - City of Berkeley
Infrastructure, Alteration
Conception
$1,414,500 est. value
Berkeley, CA 94710

Davenport Minipark Renovation
Renovation
Post-Bid
$217,874 est. value
Emeryville, CA

Elihu M Harris Water Conservation
Infrastructure
Results
$403,000 est. value
Oakland, CA 94612

Cedar Rose (2-5 And 5-12 Play Structure) - PRWPK22008 - City of Berkeley
Renovation
Conception
$875,000 est. value
Berkeley, CA 94702

East Oakland Pride Elementary School Playmatting Structure
Renovation
Post-Bid
$610,000 est. value
Oakland, CA 94621

Last Updated 07/15/2022 10:05 AM
Project Title

Piling Replacements - PRWT122012 - City of Berkeley

Physical Address View project details and contacts
City, State (County) Berkeley, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project will install new floating dock piles at locations where the piles are missing, replace moderately and severely deteriorated timber piles with new piles throughout the Marina harbor. Timber piles supporting above-water structures will also be repaired. This project is in included in the City of Berkeley FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Park/Playground, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents