Similar Projects
Cellular Domestic Water Meter Installation
Bidding
Colorado Springs, CO

Monument Raspberry Lane Street and Waterline Improvements
Bidding
Monument, CO 80132

Construction and Installation of a Meter Vault
Post-Bid
Monument, CO 80132

Repair Utilities - Falcon Stadium
Post-Bid
$1,000,000 to $5,000,000 est. value
CO

Scrub Oak Circle Waterline Replacement
Results
Monument, CO 80132

Butterfly, Gate, and Tapping Valves
Term Contract
Results
Colorado Springs, CO

New Fire Station Utility
Construction
Falcon, CO 80831

Woodmen Hills West Water Pipeline
Post-Bid
Peyton, CO 80831

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Monument Valley Park Water Utility Construction
Post-Bid
Colorado Springs, CO 80903

South Santa Fe Water Main Project
Results
Less than $500,000 est. value
Fountain, CO 80817

Water Utility Construction Services
Post-Bid
Colorado Springs, CO 80919

Fire Hydrants
Term Contract
Results
Colorado Springs, CO 80947

Rolling Hills Tank Inlet Pipeline
Post-Bid
Colorado Springs, CO

All Division Horizontal Directional Drilling Services
Results
Colorado Springs, CO 80947

Last Updated 01/17/2020 10:02 AM
Project Title

Well No. 21 Transmission Pipeline

Physical Address View project details and contacts
City, State (County) Monument, CO 80132   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct approximately 5684 linear feet of eight inch diameter water line installed utilizing various methods of construction, removal of approximately 30 linear feet of sanitary sewer main, installation of up to 11 gate valves with diameters of six and eight inch, approximately 200 square yards of asphalt surface replacement, installation of up to 5 air/vac manholes, installation of one six inch diameter pressure sustaining valve with vault, clearing and grubbing of heavy vegetation, traffic control measures, associated erosion control BMPs, maintenance of BMPs and all associated testing and appurtenances. Segregated project bids are required for alternate construction methodologies and materials that may be chosen by the Owner. A notice to proceed is anticipated by December 10, 2019.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents