Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Live Oak Drainage Wells Phase 1
Bidding
Less than $400,000 est. value
Live Oak, FL

LMI Milton Roy Metering Pump
Post-Bid
Tampa, FL 33602

Jet Water Pump Replacement
Post-Bid
Orlando, FL 32826

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Rental, Pump Equipment
Term Contract
Results
$1,250,000 est. value
FL

Cleaning of Well at Highland Village
Post-Bid
North Miami Beach, FL 33162

Regional Facility Site Pump Station Expansion Project
Results
$2,168,480 est. value
Clearwater, FL 33763

SDWWTP Plug and Abandon FA Monitoring Wells and Install / Replacement of FA Wells
Post-Bid
Less than $3,810,945 est. value
Cutler Bay, FL 33190

South Hillsborough Aquifer Recharge Expansion
Results
$1,643,200 est. value
Tampa, FL 33600

Pump
Post-Bid
Lakeland, FL 33801

N--Services: Replace Chilled Water Pumps (Service Only - Pumps/Motors Supplied)
Results
Miami, FL 33125

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Public Water Supply Well Construction
Results
Live Oak, FL 32064

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Reported 01/09/2020 12:00 AM
Project Title

Atlantic/Brentwood Deep Injection Well, IW-1 Acidization and Rehabilitation

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34230   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will need to access and kill the well during portions of the rehabilitation which will involve providing access to the injection well, controlling the artesian flow in the well at all times using salt introduced into the injection well. Any fluids spilled during the plugging and abandonment activities will be contained and properly disposed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents