Similar Projects
New High School Facility
New Construction
Conception
Baton Rouge, LA 70873

Hurricane Ida Interior Repairs at Esperanza Charter School (Crossman)
Renovation
Bidding
New Orleans, LA 70119

French Settlement High School Band Building Addition
Addition
Bidding
$600,000 est. value
French Settlement, LA 70733

Hurricane Repairs Vinton Middle School
Renovation
Post-Bid
Vinton, LA

Hurricane Laura Repairs - A.M. Barbe/SJ Welsh - Sports Fields and Building Repairs
Renovation
Post-Bid
Lake Charles, LA

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

The Career Center
Renovation - 132,881 SF
Construction
$10,000,000 CJ est. value
New Orleans, LA 70116

Holy Family Catholic School
New Construction - 22,500 SF
Construction
Lafayette, LA 70501

Great Hearts Charter School - South
New Construction - 35,376 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Fisher Temporary Facility at the Former Westbank Community School Site
New Construction
Bidding
$500,000 est. value
Marrero, LA 70072

Purchase of New Modular Classroom Buildings
New Construction
Post-Bid
Franklinton, LA

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Results
Lake Charles, LA

Beekman Charter School
Renovation, Addition
Construction
Bastrop, LA 71220

Hurricane Ida Repairs At New Orleans Public Schools - Uptown 2
Renovation
Bidding
$400,000 est. value
New Orleans, LA 70122

Reported 07/08/2022 12:00 AM
Project Title

Installation of Two Modular Classroom Buildings

Physical Address View project details and contacts
City, State (County) Kenner, LA 70065   (Jefferson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Basic Work: Includes site demolition work to remove an existing concrete basketball court and goals, existing light poles and site development to extend concrete walkway, installing new treated wood stairs/ramps, raised treated wood decks, aluminum canopies, and extend and connect to existing site utilities, as well as provide concrete foundations and coordination for the installation of two modular classroom buildings, furnished and installed by the Owners vendor.

Details

Middle/Senior High School, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents