Similar Projects
New Soo Lock, New Third Lock
New Construction
Bidding
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Jd #150
Renovation, Demolition - 11,569 SF
Construction
$550,000 est. value
Flint, MI

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

Natural Science - Loading Dock Alterations
Post-Bid
East Lansing, MI

Milham Park Dam Removal
Results
Kalamazoo, MI

Sea Lamprey Trap (East Branch) Au Gres River, MI
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Au Gres, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

Multiple Tunnel Sections - South U Tunnel - Major Maintenance and Repair
Renovation
Post-Bid
Ann Arbor, MI

Perrin Dam Improvements
Results
Marshall, MI

3.5 Mg Water Reservoir
Results
Shelby Township, MI

Last Updated 11/11/2021 04:18 PM
Project Title

Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project consists of work associated with fabrication of arrestor machinery, rehabilitation of fender booms, and rehabilitating the ship arrestors on the Poe Lock located in Sault Sainte Marie, Michigan. The Poe Lock will be required to remain in service during construction. The rehabilitation and installation of spare fender booms include repairs and installation of heat shields, placing existing fender booms on-site, removal and disposal of associated parts and components such as brake cylinders, bollards, quadrants, wire rope, etc. Rehabilitation also includes the removal and disposal of existing rolling segment buildings housing the boom rolling segment and buildings made with asbestos containing wall panels and fabrication, testing, and installation of new arrestor machinery. There will be two optional contract line items for this project. The majority of the installation work is required to occur between January 15 – March 25.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents