Similar Projects
Overhead Door and Gate Maintenance and Repair
Term Contract
Post-Bid
Abilene, Albany, Anson, Aspermont, Big Spring, Colorado City, Gail, Haskell, Jayton, Roby, Snyder, Sweetwater, TX 79601

Overhead Door and Gate Maintenance and Repair
Term Contract
Post-Bid
Abilene, Albany, Anson, Aspermont, Big Spring, Colorado City, Gail, Haskell, Jayton, Roby, Snyder, Sweetwater, TX 79601

Doors/Windows/Hardware Supplies
Results
Pleasanton, TX 78064

Driver Barrier Door Installation
Results
San Antonio, TX 78212

RCC Automatic Sliding Door Refurbishment
Post-Bid
Dallas, TX

Interior/Exterior Window Cleaning Services
Results
Less than $250,000 est. value
Austin, Marble Falls, TX 78703

JBSA Door Lock BPA
Term Contract
Post-Bid

Formal - Warehouse Door Repair Services at Turning Basin Terminal
Results
Houston, TX

John Peace Library (JPL) Replace Exterior with Windows
Results
$1,252,181 est. value
San Antonio, TX 78275

Reported 08/13/2021 12:00 AM
Project Title

Various Overhead Roll-Up Doors at NAS Corpus Christi, TX

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX   (Nueces County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value Less than $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and properly dispose of nine (9) each roll-up doors, associated hardware and replace with nine (9) each new commercial grade, 24 gauge, hot-dipped galvanized steel roll-up doors. All doors shall incorporate new steel hoods. Contractor shall note specifics see Attachment G, Lead Paint Lab Report. The contractor shall submit a Lead Base Paint Hazard Abatement Plan to Public Works FEAD and Environmental Division prior to starting any work. All lead base paint containing materials shall be disposed of in accordance with all federal, state and local regulations. Contractor shall place plastic on the floor to collect any flaking paint. Flaking paint shall be properly disposed as stated above. Replacement shall include: gear and motor mechanisms, push button operators, side tracks, manual operation chains and perimeter weather seals. All door hardware required to install doors shall be galvanized steel. Contractor is responsible for making any modifications to door frames to accommodate new doors while keeping in mind that there is lead paint present, see Attachment G, Lead Report for lead paint test results.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents