Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

STEAM Lab at Karel Havlicek ES
Renovation
Post-Bid
Berwyn, IL 60402

2021 Capital Improvements at Lincoln ES
Post-Bid
Cicero, IL 60804

2021 School Renovations and Additions
Renovation, Addition
Results
Mount Prospect, IL 60056

NCP Hibbard Elementary School
Results
Chicago, IL 60625

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Washington Elementary School Facility Expansion
Addition - 7,000 SF
Construction
Park Ridge, IL 60068

Guidepost Montessori Remodel
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$400,000 CJ est. value
Arlington Heights, IL 60004

2021 Improvements at Multiple Schools
Renovation
Post-Bid
Des Plaines, Glenview, Niles, IL 60016

2021 Summer Facilities Improvements
Renovation
Results
Hickory Hills, IL 60457

Christa McAuliffe Elementary School
Renovation
Post-Bid
Tinley Park, IL 60487

CPS Drake ES/Addams ES- (VT Pool)
Renovation
Results
Chicago, IL 60616

STEAM Lab Renovation - Jefferson Elementary School
Renovation
Post-Bid
Berwyn, Cicero, IL 60804

CPS Whistler NCP
Results
Chicago, IL 60643

Selective Flooring and Toilet Room
Renovation
Post-Bid
Calumet City, IL

Last Updated 08/30/2022 01:13 PM
Project Title

Manuel Perez Public School - Chicago Public Schools (CPS)

Physical Address View project details and contacts
City, State (County) Chicago, IL 60608   (Cook County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is included in the city's 2023 Capital Improvement Plan (CIP) and funding is allotted for FY 2023. As of August 30, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents