Similar Projects
Cross Connection Devices
Bidding
Denver, CO

Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

Havana Street 30 Inch Water Line Renewal
Results
$2,250,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Last Updated 02/25/2020 10:17 AM
Project Title

Water Softening Project 24 Inch Transmission Line

Physical Address View project details and contacts
City, State (County) Commerce City, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of installing approximately 7,300 lineal feet of 24-inch transmission water line, a 36-inch bored casing under the Burlington Northern Santa Fe Railroad and Highway 2, and associated asphalt removal and replacement. The 24-inch water line is to be constructed from the Districts Well 18 site (7391 E 84th Avenue) to a point of connection near the Districts Water Treatment Facility (7400 Quebec Street). The pipeline alignment crosses 84th Avenue and runs through District property and easements, then is located along Rosemary Street, Highway 2, and Quebec Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents