Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

New Ball Fields
Infrastructure
Bidding
$2,500,000 CJ est. value
Plainfield, IA 50666

New Ball Fields
Infrastructure
Bidding
$2,500,000 CJ est. value
Plainfield, IA 50666

Oak District II Assisted Living
New Construction, Infrastructure - 9,813 SF
Sub-Bidding
$2,500,000 CJ est. value
Cedar Falls, IA 50613

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

2022 Pressbox, Courtyard, and Batting Cage Project
Renovation
Post-Bid
$350,000 CJ est. value
Janesville, IA 50647

Cedar Falls West Viking Road Industrial Park Phase V
Addition, Infrastructure - 180,675 SF
Results
Cedar Falls, IA 50613

2022 Road Program
Infrastructure
Results
$289,643 CJ est. value
Boone, IA 50036

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

Last Updated 03/20/2023 08:11 AM
Project Title

Storm Lake Middle School Playground Contract

Physical Address View project details and contacts
City, State (County) Storm Lake, IA 50588   (Buena Vista County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $327,610 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the construction of new playgrounds for the Storm Lake Middle School. Work on the Project shall commence as soon as possible after notice of the Contract and is currently scheduled for a substantial completion date on or before August 1, 2023, with Final Acceptance to be no later than sixty (60) days after substantial completion Bids must be a lump sum basis for multiple bid packages as described in the specifications. Each Bidder shall accompany its bid with bid security in a separate, sealed envelope as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and provide bonds and proof of insurance as specified herein. The Bidder's security shall be in an amount equal to five percent (5%) of the amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board of Directors for the Storm Lake Community School District. The bid shall contain no condition except as provided in the specifications. Bid security shall be made payable to Storm Lake Community School District. The successful Bidder will be required to furnish within ten (10) days of the award proof of insurance as required by the Bid Documents and a Performance Bond and Labor and Material Payment Bond both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Should the successful bidder fail or neglect to furnish proof of required insurance, satisfactory performance/payment bonds, refuse to enter into a Contract on the basis of the bid, or fail to meet the requirements of this Notice and the specifications regulating the award, the bidder's security may be retained as liquidated damages. No bidder may withdraw its bid for a period of sixty (60) calendar days after the date and hour set for opening of bids. The Board of Directors may make the contract award to the lowest responsive, responsible bidder meeting specifications. The right is reserved to reject any or all bids, or any part thereof, and to waive informalities as allowed by law, and to enter into such contract or contracts as shall be deemed in the best interests of the Storm Lake Community School District. Minority and Targeted Small Business participation is encouraged. Bidders shall make a good faith documented effort to encourage the participation of Certified Iowa Targeted Small Business in accordance with the Code of Iowa. By virtue of statutory authority, a preference will be given to products and provisions grown and/or produced within the State of Iowa.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents