Similar Projects
Construction of Center Street Wastewater Line Phase 1
Infrastructure
Bidding
Kyle, TX

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Sunfield Phase 5 Section 1A, Section 1B, and Section 2 Grading Improvements; Sunfield Phase 5 Section 1A, Section 1B, and Section 2 Street, Drainage, Water, Wastewater, and Utility Improvements
Infrastructure
Post-Bid
Buda, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Right-Of-Way Acquisition Service
Results
San Marcos, TX 78666

Sunfield Phase 5 Section 4 Grading Improvements; Sunfield Phase 5 Section 4 Street, Drainage, Water, Wastewater, and Utility Improvements; and Sunfield Phase 5 Section 4 Paving Improvements
Infrastructure
Post-Bid
Buda, TX

Trails at Windy Hill Phase 6 and 7 - Paving, Drainage, Water and Wastewater Improvements
Results
TX

Treehaven Water Line Upsizing
Infrastructure
Post-Bid
Buda, TX 78610

150 Business Park Public/Private Wastewater Line
Results
Kyle, TX 78640

Subdivision Improvements for Anthem Phases 1C-2, 1C-3, 2, 3, and 4
Infrastructure
Post-Bid
TX

Piland Triangle Interconnect
Infrastructure
Results
$1,782,770 est. value
Austin, TX

RM967 West Water Utility Relocation
Infrastructure
Post-Bid
Buda, TX

Sweetwater Village C&D
Infrastructure
Results
Austin, TX

Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality, and Drainage Improvements for Provence Phase 1, Section 6
Infrastructure
Post-Bid
Austin, TX

CR 266 Waterline Relocation Project
Infrastructure
Results
$578,000 est. value
San Marcos, TX

Last Updated 04/20/2022 09:15 AM
Project Title

HWY 21 Water Line Extension Project

Physical Address View project details and contacts
City, State (County) San Marcos, TX   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,345,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes installation of approximately 9,030 linear feet of 8-inch PVC water line at City of San Marcos Regional Airport property along State Highway 21, from Airport Drive to William Pettus Drive. The majority of the installation is open cut trenching, and 400 linear feet of the installation is by jack and bore.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents