Similar Projects
Mowing and Garbage Pickup
Post-Bid
Camak, GA 30807

Obstruction Removal for Runways 08 and 26
Post-Bid
Blairsville, GA 30512

Exit 20 Interchange Beautification/Gateway Grant Project - Phase II
Results
Gainesville, GA 30501

Roadside Mowing and Spraying on Paved County Roads
Term Contract
Results
GA

Obstruction Removal at Butler Municipal Airport
Post-Bid
Butler, GA 31006

Horizontal and Vertical Mowing and Spraying on County Dirt Roads and Paved Road Right-of-Ways
Term Contract
Results
Less than $748,773 est. value
GA

Road and Row Maintenance Services 2019
Term Contract
Post-Bid
Tallulah Falls, GA

Roadside Mowing and Spraying on Paved County Roads
Results
Statesboro, GA 30458

Purcell Road
Post-Bid
Homer, GA

Laura S. Walker State Park Bunker Renovations
Results
Waycross, GA 31503

T32 Highway Mowing and Maintenance Services
Term Contract
Post-Bid

Obstruction Clearing - ATC Tower Line of Site Area
Results
Atlanta, GA 30336

Landscape and Maintenance of 155 Old Mill Road
Post-Bid
Cartersville, GA 30120

Forest Lawn Cemetery Improvements
Results
Cairo, GA 39828

Union City South Futon Parkway Landscaping
Post-Bid
Union City, GA 30291

Last Updated 12/11/2018 04:23 AM
Project Title

Obstruction Clearing - Primary Surface Area (Mid-Field)

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30336   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project shall consist of the removal of trees and brush within the work zones. The Primary Surface Area (Mid-Field) Work Zone is estimated at 2.5 acres. A staging area for equipment has been established adjacent to the work area. The site of the proposed work is located at the Fulton County Airport -Brown Field. The site is located along the north-side of Runway 8/26 with most of the work being performed within and adjacent to the runway safety area for the primary runway at the airport. The site is comprised of two relatively flat terraces; a lower level and an upper level. To minimize the impact to normal airport operations, the vendor shall perform most of his work from the lower level terrace.
Details
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents