Similar Projects
Madison Food Park Cheese Processing Facility
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Great Falls, MT 59401

Valeria Way, Phase 2 - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

Upper River Road (Mill and Overlay) - City of Great Falls
Infrastructure
Design
$325,000 CJ est. value
Great Falls, MT 59405

Elks Riverside Park Force Main Replacement
Infrastructure
Post-Bid
$300,000 est. value
Great Falls, MT 59401

RFQ Contractor - Construct Fire Station Bay Storage Area at Malmstrom Air Force Base (MAFB)
New Construction, Infrastructure - 20,000 SF
Post-Bid
$10,000,000 CJ est. value
Malmstrom AFB, MT 59402

Gore Hill Water System Improvements
Infrastructure
Results
$2,238,375 CJ est. value
Great Falls, MT 59401

Repair Vehicle Ground Points at Launch Facilities
Infrastructure
Results
$500,000 est. value
MT

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

Great Falls Clinic Surgery Center Expansion
Addition, Demolition, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Great Falls, MT 59401

3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

Missouri River North Bank Stabilization Phase I
Infrastructure
Post-Bid
$600,000 CJ est. value
Great Falls, MT 59401

Southwest Side Water Main Replacement Phase III
Infrastructure
Results
$1,400,000 est. value
Great Falls, MT

Carter Commons
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Great Falls, MT 59404

52nd Street North 7th to 10th Avenue North Reconstruction - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

Last Updated 04/27/2023 09:42 AM
Project Title

Valeria Way Strom Drain Lining

Physical Address View project details and contacts
City, State (County) Great Falls, MT 59405   (Cascade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $559,386 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project awarded to S.J. Louis Construction for $559,386.31. As of March 10th, 2023, project has not be awarded yet. Commission will vote, and awarded or not award on the evening of March 21st, 2023. The project consists of the installing approximately 3,000 linear feet of 18-inch, 24-inch, and 30- inch Cured-In-Place-Pipe (CIPP); cleaning and videoing host pipe; and internally reinstating approximately 2 service connections. Bidder questions will be accepted until 5:00 p.m. local time on February 23, 2022 and must be provided in writing via e-mail to Ryan Shaneybrook at rshaneybrook@greatfallsmt.net. CONTRACTOR, and any of the CONTRACTOR'S subcontractors doing work on this project, will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. CONTRACTOR is not required to have registered with the DLI prior to bidding on this project, but CONTRACTOR and subcontractors must have registered prior to execution of the Construction Agreement. All laborers and mechanics employed by the CONTRACTOR, or subcontractors in performance of the construction work, shall be paid wages at rates as may be required by the laws of the City of Great Falls and the State of Montana. The CONTRACTOR must ensure that employees, and applicants for employment, are not discriminated against because of their race, color, religion, sex or national origin. Insurance, as required, shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Contractor, and all subcontractors, must be licensed to perform work in the City of Great Falls prior to contract award. No bid may be withdrawn after the scheduled time for public opening of bids The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents