Similar Projects
East Hickman Force Main
Infrastructure
Bidding
$400,000 est. value
Lexington, KY

Licking River Crossing
Infrastructure
Bidding
$400,000 est. value
Covington, KY

Water System Improvements Ph 11 - Zone Meter & River Crossing Installation Re-Bid
Post-Bid
Irvine, KY

Miscellaneous Water System Improvements - Rebid
Post-Bid
Paintsville, KY

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Billtown Road Area - Angel Terrace Water Main Replacement Project
Infrastructure
Bidding
$250,001 to $500,000 est. value
Louisville, KY 40281

Chiller and Water Replacement at Rutherford Elementary School
Post-Bid
Louisville, KY 40214

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Billtown Road Area - Chambers Way and Seagrape Road Water Main Replacement Project
Infrastructure
Bidding
$250,001 to $500,000 est. value
Louisville, KY

Third Street Water Line Relocation
Post-Bid
Maysville, KY

Montpellier Drive Water and Sewer Rehabilitation
Results
Fort Knox, KY 40121

Water Main Material
Infrastructure
Bidding
Elizabethtown, KY

Bloomfield Road S.R. 55 Waterline Replacements - Contract 23
Post-Bid
Taylorsville, KY 40071

Last Updated 05/28/2022 03:18 AM
Project Title

Mcalpine Waterline Repair/Replacement

Physical Address View project details and contacts
City, State (County) Louisville, KY 40212   (Bullitt County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). This preliminary site characterization report was developed for the McAlpine Locks and Dam Water Line Repair/Replacement project. Recently the water line, which supplies water to facilities within the Shippingport Island, was damaged along the section that is located within the Louisville and Portland Canal. Based on As-built drawings, the portion of the water line within the canal is an 8-inch polyethylene pipe. The conceptual repair solution is to replace the damaged portion of the water line with a new section installed under the canal utilizing horizontal directional drilling (HDD). The newly installed pipeline would tie into the existing water line on both the north and south sides of the canal. There is an approximate 21 feet tall concrete guide wall along the south side of the canal at the existing water line location. Once on the southside of the guide wall, the existing water line was generally installed parallel with the guide wall for approximately 1300 feet. The north side of the canal consist of a riprapped and overgrown vegetated sloped bank at the existing water line location.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents