Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Design Build - Construct Parking South East Campus
Alteration
Results
$2,000,000 to $5,000,000 est. value
Mather, Rancho Cordova, CA 95655

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Victory Avenue Apartment / Flemings Highway Farms
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Sacramento, CA 95828

Roseville Road at Diablo Drive Traffic Signal Project
Infrastructure
Post-Bid
$916,269 CJ est. value
Sacramento, CA 95842

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Last Updated 02/16/2024 07:07 PM
Project Title

Watt Avenue Sidewalk Gap Closure Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95821   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $930,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: clearing & grubbing, installation of curb, gutter and sidewalk, pavement grinding, pavement removal, tree removal, roadway excavation, aggregate base, asphalt pavement, street lighting, installation and relocation of roadside signs, drainage improvements and doing all other work specified on the plans and in the specifications. THE ENGINEER'S ESTIMATE IS HEREBY CHANGED TO $930,000 CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A There is no pre-bid meeting for this project. The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder. By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: December 12, 2023 Direct pre-bid questions to the Project Manager, Gabriel Flores, via the Q&A tab in the portal. ALL PREBID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Thursday, February 8, 2024 BY 4:00 pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents