Similar Projects
Holiday Park Sanitary Sewer Extension Project - Sewer and Force Main Construction
Results
$1,800,000 to $2,000,000 est. value
Harrisburg, PA 17111

Maintenance and Emergency Repairs to Wastewater Collection System
Results
Harrisburg, PA 17110

Mary Alley Sewer Replacement Project
Results
$145,000 to $185,000 est. value
Highspire, PA 17034

Arsenal Boulevard Sewer Improvements - Phase 1
Results
$2,300,000 to $2,700,000 est. value
Harrisburg, PA 17103

2020 Sewer System Improvements
Results
$2,000,000 to $2,900,000 est. value
Harrisburg, PA 17101

Londonderry Estates Low Pressure Sewer Extension
Infrastructure
Results
$650,000 est. value
Middletown, PA

2020 Sewer Replacement
Results
Royalton, PA 17057

Wiconisco Creek Interceptor Improvements Project
Infrastructure
Post-Bid
Lykens, PA

2020 Sewer Replacement and Rehabilitation Project CIPP Lining
Results
Royalton, PA 17057

2021 Sanitary Sewer Improvements Project
Infrastructure
Results
$1,000,000 est. value
Harrisburg, PA

Maintenance and Emergency Repairs to the Wastewater and Stormwater Collection Systems
Results
Harrisburg, PA 17109

Southeast Sewer Extension
Results
$2,800,000 to $3,000,000 est. value
Harrisburg, PA 17110

Highway Inlets Boxes, Grates, Frames Supplement 2
Results
Harrisburg, PA 17102

2020/2021 Lining Project
Term Contract
Results
Harrisburg, PA 17109

CCTV Inspection and Repair Project - Edgmont, Middletown and Rose Valley
Results
$870,000 to $970,000 est. value
Edgemont, Middletown, Rose Valley, PA

Last Updated 07/14/2021 04:13 PM
Project Title

2021 Sewer System Improvements Project

Physical Address View project details and contacts
City, State (County) Harrisburg, PA   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 06/07/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Project generally includes, but is not limited to, approximately 12,580 linear feet of cured-in-place pipe (CIPP) lining of 8 thru 36-inch diameter sewer main; removal of 108 intruding laterals; CIPP lining lateral reinstatement of 444 sewer laterals; 69 linear feet of geopolymer lining of 36-inch diameter sewer main; installation of 3,400 linear feet of 8 through 48-inch diameter sewer main and associated appurtenances; replacement of 29 sewer manholes; installation of 21 sewer manholes; abandonment of eight (8) sewer manholes; rehabilitation of 34 sewer manholes; replacement of 100 storm sewer inlets; replacement of three (3) storm sewer inlet tops; repointing of three (3) existing brick storm sewer inlets; installation of three (3) ADA ramps; restoration; and all other work identified in the Contract Documents. The Work is geographically located at multiple sites within the City of Harrisburg. The Work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents