Similar Projects
Design-Build Services for SR 836 New Heft Ramp Connections
Infrastructure
Bidding
Miami, FL

Shoulder Repair
Infrastructure
Bidding
$150,000 est. value
FL

Roadway Improvements to NW 97 Avenue from NW 58 Street to NW 70 Street
Post-Bid
Less than $5,405,820 est. value
Miami, FL 33128

Improvements to Downtown Mobility
Post-Bid
Less than $1,042,751 est. value
Miami, FL 33129

Roadway Improvements to NW 7 Street from NW 79 Avenue to SR 826
Results
Less than $2,272,935 est. value
Miami, FL 33128

Roadway Resurfacing-Multiple Site
Results
Less than $2,831,648 est. value
Miami, FL 33128

Roadway Resurfacing - Multiple Sites
Infrastructure
Bidding
$3,187,716 est. value
Miami, FL 33106

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

Roadway Milling, Resurfacing snd Miscellaneous Right-of-Way Improvements Treasure Island
Results
Less than $1,500,000 est. value
North Bay Village, FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Roadway Resurfacing - Multiple Sites
Results
Less than $2,456,426 est. value
FL

SR 826 - Palmetto Expressway Capacity Improvement Project (FPID)
Post-Bid
Miami Lakes, FL 33014

Roadway Resurfacing - Multiple Site
Results
Less than $2,831,648 est. value
FL

Design-Build Adaptive Re-Use Infrastructure Redevelopment
Post-Bid
Doral, FL 33178

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Last Updated 10/28/2021 09:00 AM
Project Title

Traffic Circle Improvements at SW 62 Avenue and SW 48 Street

Physical Address View project details and contacts
City, State (County) Miami, FL 33134   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $318,000
Plans Available from Agency's Affiliate until 04/01/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to furnishing all supervision, labor, materials, equipment, and tools to perform roadway lighting improvements and installations including any ancillary work. Roadway lighting upgrades includes the installation of light pole complete, pole cable distribution system, lighting conductors, electric power service underground, pull and splice box, traffic control cable, conduit, clearing and grubbing, and maintenance of traffic.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents