Similar Projects
Sardis Road Apartments
New Construction - 2,414,590 SF
Conception
$10,000,000 CJ est. value
Asheville, NC 28806

Mcintosh Apartments
New Construction
Design
Asheville, NC 28806

Hvac Improvements (Design Build)
Alteration
Results
NC

Black Mountain Primary Entire Building Split System Indoor and Outdoor Unit Replacement
Alteration
Results
$145,500 est. value
Black Mountain, NC 28711

Crescent Hill Apartments
New Construction
Pending Verification
Arden, NC 28704

Audubon Place - Phase III
New Construction - 28,000 SF
Pending Verification
Arden, NC 28704

West Buncombe Elementary School Replace (2) Separated Combustion Makeup Air Handlers
Alteration
Results
$37,000 est. value
Asheville, NC 28806

Replace Chiller at C. C. Bell Elementary School
Alteration
Results
Asheville, NC 28805

Replace (2) Chillers at C.D. Owen Middle School
Alteration
Results
Swannanoa, NC 28778

Replace (2) Chillers at Candler Elementary School
Alteration
Results
Candler, NC 28715

Replace Chiller at Pisgah Elementary School
Alteration
Results
Candler, NC 28715

Replace Chiller at Weaverville Primary School
Alteration
Results
Weaverville, NC 28787

Replace Chiller at Woodfin Elementary School
Alteration
Results
Woodfin, NC 28804

Replace 35 Bard Units County Wide (Labor Only)
Alteration
Results
Asheville, NC

Dr. Wesley Grant Senior Center Expansion
Addition
Results
$7,000,000 est. value
Asheville, NC 28801

Last Updated 07/21/2022 03:16 PM
Project Title

Shiloh HVAC Upgrades - Linwood Crump Shiloh Community Center

Physical Address View project details and contacts
City, State (County) Asheville, NC 28803   (Buncombe County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Clubhouse/Social Club, HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

BASE SCOPE: The overall scope of the project is to replace the existing hot water boiler system and provide heating and air conditioning for the gymnasium. This includes but is not limited to any and all materials, accessories, wiring, cabling, plumbing necessary to have a fully functioning system as intended. A basic overview includes the following: 1. Demolish the existing boiler, pumps, and piping system in the boiler room. 2. Install two new condensing boilers, pumps, piping, and flues. Boiler system controls will be integral to the boilers. 3. Demolish exhaust fan system and hot water piping in the gymnasium and locker rooms. 4. Install new rooftop heat pump and ductwork to condition the gym and locker rooms. 5. Provide structural reinforcement for the roof to support the rooftop unit. 6. Provide electrical system upgrade and power for rooftop unit and boiler. 7. Repair/patch locker room ceiling, roof curbs where fans are removed, and wall openings where intake louvers are removed. The City of Asheville reserves the right to postpone bid openings for its own convenience. In the event of inclement weather and the City Offices are closed, the bid opening will be held at 11:00 a.m. the next business day that the City Offices are open. Deadline to Submit Quesons Friday, 4/22/2022 @ 5:00PM Final Addendum Posted By 4/26/2022

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents